Tender Details

Particulars Details
Title
Construction Of 55 Nos. Rcc Ventilation Stoppings In Vi Top (Combined) Seam For Proposed Depillaring Panel C3 And C4 At Bangwar Ug Mine
Description
Construction Of 55 Nos. Rcc Ventilation Stoppings In Vi Top (Combined) Seam For Proposed Depillaring Panel C3 And C4 At Bangwar Ug Mine
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2026_SECL_359538_1
Reference
Number
SECL/SGP/SO(M)/2025-26/NIT-730 dated 13-05-2026
Tender Fee 0
EMD 86600
Tender Value
Place BANGWAR UG MINE
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=372408

Start Date May 14, 2026 16:30
End Date
Expired 30/05/2026

Expired 36 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region

P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region

Read more
Provn of septic tank and soakage well for 100 users at lkg (rr) and repair/replacement of solar lights in 10 ib at kg top and demolition of bldg no t-41 located at village- samote poonch under ge 881 ews

Provn of septic tank and soakage well for 100 users at lkg (rr) and repair/replacement of solar lights in 10 ib at kg top and demolition of bldg no t-41 located at village- samote poonch under ge 881 ews

Read more
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.

Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.

Read more
Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.

Engagement of 02 nos. tractor mounted water tanker for supplying of water for construction purpose at hijukita rehab site (near school and masjid area) for the period of 320 days under rajmahal area.

Read more
Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and stp md accn at jak li rc srinagar under ge 970 ews

Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. &#x0d no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and &#x0d stp md accn at jak li rc srinagar under ge 970 ews

Read more

Planning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.

Read more
Construction of 39 nos. rcc isolation stoppings in proposed depillaring panel ( cm panel-c3 and c4) in vi top seam at bangwar ug mine

Construction of 39 nos. rcc isolation stoppings in proposed depillaring panel ( cm panel-c3 and c4) in vi top seam at bangwar ug mine

Read more
Construction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine

Construction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine

Read more
Construction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine

Construction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine

Read more
Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine

Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise