Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Roadway For Marching Of Continuous Miner From Vii Seam To Vi Top ( Vi Top And Vi Bottom Combined Seam) At Bangwar Ug Mine
|
| Description |
Preparation Of Roadway For Marching Of Continuous Miner From Vii Seam To Vi Top ( Vi Top And Vi Bottom Combined Seam) At Bangwar Ug Mine
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_310377_1 |
|
Reference Number |
SECL/SGP/SO(M)/eT/35/24-2 5/654 Dt13.06.2024 |
| Tender Fee | 0 |
| EMD | 1.25 Lakh |
| Tender Value | - |
| Place | Bangwar UG MIne |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321609 |
| Start Date | June 14, 2024 15:30 |
| End Date |
Expired
01/07/2024
Expired 832 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreRepairing of ventilation stoppings in vi bottom vi top and vii seam at bangwar ug mine of sohagpur area
Repairing of ventilation stoppings in vi bottom vi top and vii seam at bangwar ug mine of sohagpur area
Read moreInstallation of track line after marching of continuous miner and other machineries at rviia seam of shyamsundarpur col-liery
Installation of track line after marching of continuous miner and other machineries at rviia seam of shyamsundarpur col-liery
Read moreConstruction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine
Construction of 5 nos. rcc sectionlization stopping in vi bottom seam at bangwar ug mine
Read moreConstruction of 55 nos. rcc ventilation stoppings in vi top (combined) seam for proposed depillaring panel c3 and c4 at bangwar ug mine
Construction of 55 nos. rcc ventilation stoppings in vi top (combined) seam for proposed depillaring panel c3 and c4 at bangwar ug mine
Read moreConstruction of 05 nos of rcc sectionalization stopping in vi bottom seam at bangwar ug mine
Construction of 05 nos of rcc sectionalization stopping in
 vi bottom seam at bangwar ug mine
Read moreConstruction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine
Construction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine
Read moreDrain cutting along the travelling roadway at c.m marching route of r-vi seam of khottadih colliery, pandaveswar area.
Drain cutting along the travelling roadway at c.m marching route of r-vi seam of khottadih colliery, pandaveswar area.
Read moreRegular cleaning of debris of coal dust / spillage coal / malma below loading point /tail end discharge point and nearby along trunk belt roadway and gate belt/ district belt roadway of seam-1 combined top seam and seam 0(bottom seam) at gayatri ug
Regular cleaning of debris of coal dust / spillage coal / malma below loading point /tail end discharge point and nearby along trunk belt roadway and gate belt/ district belt roadway of seam-1 combined top seam and seam 0(bottom seam) at gayatri ug
Read moreof your Industry type