Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of 06 Nos. Of Transformer Tsu315 Kva, 3.3 Kv / 570 V With All Electrical Equipments And Shifting Of Main Acb, Coupled Acb For Proposed Development And Depillaring Panels At Seam Vii And Vi(b) Khairaha Ug Mine
|
Description |
Shifting Of 06 Nos. Of Transformer Tsu315 Kva, 3.3 Kv / 570 V With All Electrical Equipments And Shifting Of Main Acb, Coupled Acb For Proposed Development And Depillaring Panels At Seam Vii And Vi(b) Khairaha Ug Mine
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333865_1 |
Reference Number |
SECL/SGP/SO(M)/e-T/35/24-2 5/683 Dt007.04.2025 |
Tender Fee | 0 |
EMD | 33700 |
Tender Value | |
Place | khairaha UG Mine |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346097 |
Start Date | April 09, 2025 15:30 |
End Date |
21/04/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine
Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine
Read moreOperation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Operation and maintenance of 245 mld. sbr based stp, mps- 2 nos., pumping main 1400mm dia. and 33/0.415 kv substation- 2 nos. comprising of all civil, electrical, mechanical and other allied works and utilities including specified staff at kabitk
Read moreConstruction of 04 nos of rcc wall for underground water tank incl. laying and fitting of pipeline in development /widening and depillaring panel(cm panel-c1 and c2)in vi top seam at bangwar ug mine(for the year 2024-25 and 2025-26)
Construction of 04 nos of rcc wall for underground water tank incl. laying and fitting of pipeline in development /widening and depillaring panel(cm panel-c1 and c2)in vi top seam at bangwar ug mine(for the year 2024-25 and 2025-26)
Read moreConstruction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Construction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug
Read moreConstruction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Construction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Read moreConstruction of 12 nos of isolation stopping for finally seal of proposed depillaring working panel vibe 12 of burhar vi seam at damini ug mine
Construction of 12 nos of isolation stopping for finally
 seal of proposed depillaring working panel vibe 12 of
 burhar vi seam at damini ug mine
Read moreProv annual maint contract and operation of internal and external electrical installation 33 11 kv two nos 1 mva transformer and two nos 11 0.4 distribution transformer with all accessoreis at satpuda bhawan bpl
Prov annual maintenance contract and operation of internal and external electrical installation 33 11 kv two nos 1 mva transformer and two nos 11 0.4 distribution transformer with all accessoreis at satpuda bhawan bpl
Read moreRepairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s
Repairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s
Read moreConstruction of foundation/ plate from for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Construction of foundation/ platefrom for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine
Read moreof your Industry type