Tender Details
Particulars | Details |
---|---|
Title |
Ie Services During On M Stage Of 4 L Of Gomati Chauraha Udaipur Section Of New Nh 58) (Length 79.310 Km.) And 4 L Of Rajsamand Bhilwara Section Of Nh 758 (Length 87.250 Km.) Under Nhdp Phase Iv (Total Length 166.56 Km.)
|
Description |
Ie Services During On M Stage Of 4 L Of Gomati Chauraha Udaipur Section Of New Nh 58) (Length 79.310 Km.) And 4 L Of Rajsamand Bhilwara Section Of Nh 758 (Length 87.250 Km.) Under Nhdp Phase Iv (Total Length 166.56 Km.)
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_208452_1 |
Reference Number |
NHAI/11011/Tenders-ROJ/IE-GU |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI RO JAIPUR |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=228009 |
Start Date | September 17, 2024 14:30 |
End Date |
06/11/2024 ( Expired 193 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreMaintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Read moreIe services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Ie services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Read moreof your Industry type