Tender Details

About Tender

🛣️ Invitation For Bids: Nh102 Chhapra Rewaghat Muzaffarpur Section 🛣️ The National Highways Authority Of India (Nhai) Is Calling For Bids From Experienced Contractors For The Strengthening And Major Maintenance Of The 2 Lane Chhapra Rewaghat Muzaffarpur Section Of Nh102. 🚧 📍 Project Scope: From Km 1.300 To Km 74.200 Ec And Km 1.300 To Km 74.379 Dc, Covering A Total Design Length Of 73.079 Kms. In Bihar. 🗓️ Bid Submission Deadline: April 24, 2024, 11:00 Am 💸 Tender Fee: Inr 10,000 💸 Earnest Money Deposit (Emd): Inr 8,557,000 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Specifications And Guidelines Provided In The Tender Document. Keywords: Nhai, Highway Maintenance, Infrastructure Development, Public Sector Undertaking, Tender, Bid Submission, Earnest Money Deposit, Nh102, Bihar
Particulars Details
Title
Strengthening And Major Maintenance Of 2 Laning With Paved Shoulder Of Chhapra Rewaghat Muzaffarpur Sec Of Nh102 From Km 1.300 To Km 74.200 Ec And Km 1.300 To Km 74.379 Dc (Total Design Length 73.079 Kms.) In Bihar On Pbmc Mode (2nd Call).
Description
Strengthening And Major Maintenance Of 2 Laning With Paved Shoulder Of Chhapra Rewaghat Muzaffarpur Sec Of Nh102 From Km 1.300 To Km 74.200 Ec And Km 1.300 To Km 74.379 Dc (Total Design Length 73.079 Kms.) In Bihar On Pbmc Mode (2nd Call).
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_190869_1
Reference
Number
NHAI/PIU/Chhapra/ Chhapra Muzaffarpur/Maintenance
Tender Fee 10000
EMD 85.57 Lakh
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=209003
Start Date March 12, 2024 00:25
End Date

27/05/2024 ( Expired 404 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)

4 laning of paramakudi to ramanathapuram sec of nh49 new nh87 from km 80.360 to km 127.025 dc in tamil nadu on hybrid annuity mode (project length-46.665km)

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode

Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode

Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise