Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Restructuring Of Dedicated Corridor To Mix Lane Corridor Brts Package 2 Roshanpura To Kamla Park
|
| Description |
Restructuring Of Dedicated Corridor To Mix Lane Corridor Brts Package 2 Roshanpura To Kamla Park
|
| Organisation | Directorate Urban Administration and Development | State Govt. and UT |
| Tender Id | 2024_UAD_325616_1 |
|
Reference Number |
2020218846 |
| Tender Fee | 16534 |
| EMD | 1.44 Lakh |
| Tender Value | - |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=387494 |
| Start Date | February 03, 2024 16:00 |
| End Date |
Expired
09/02/2024
Expired 940 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restructuring of dedicated corridor to mix lane corridor brts package 1 misrod to ampri
Restructuring of dedicated corridor to mix lane corridor brts package 1 misrod to ampri
Read moreRestructuring of dedicated corridor to mix lane corridor brts package 3 collectorate to lalghati
Restructuring of dedicated corridor to mix lane corridor brts package 3 collectorate to lalghati
Read moreRepairing and maintenance of dedicatred lane and bus stop on brts corridor no 1.
Repairing and maintenance of dedicatred lane and bus stop on brts corridor no 1.
Read moreIn hariparvat zone, ward no. 80, in kamla nagar hydel colony, road construction work will be carried out using hot mix asphalt in the lane next to the park.
In hariparvat zone, ward no. 80, in kamla nagar hydel colony, road construction work will be carried out using hot mix asphalt in the lane next to the park.
Read morePackage no elevated corridor_jorhat/assam/01 construction of 3-lane elevated corridor on a t road from barua chariali to bhogdoi bridge in jorhat district of assam
Package no elevated corridor_jorhat/assam/01 construction of 3-lane elevated corridor on a t road from barua chariali to bhogdoi bridge in jorhat district of assam
Read moreDevelopment of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh116a (package 5) in the state of west bengal under ham mode.
Development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh116a (package 5) in the state of west bengal under ham mode.
Read moreDevelopment of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode
Development of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Read moreCs for ae for cons. of 6 lane elevated corridor from 612.582 to km 617.540 including cons. of dedicated flyover towards kolhapur city on nh 48 in flood affected zone of kolhapur (descoped work of kagal satara pkg1). 2nd level ramp(0.000-1.263) in mh
Cs for ae for cons. of 6 lane elevated corridor from 612.582 to km 617.540 including cons. of dedicated flyover towards kolhapur city on nh 48 in flood affected zone of kolhapur (descoped work of kagal satara pkg1). 2nd level ramp(0.000-1.263) in mh
Read moreof your Industry type