Tender Details

Particulars Details
Title
Restructuring Of Dedicated Corridor To Mix Lane Corridor Brts Package 2 Roshanpura To Kamla Park
Description
Restructuring Of Dedicated Corridor To Mix Lane Corridor Brts Package 2 Roshanpura To Kamla Park
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id 2024_UAD_325616_1
Reference
Number
2020218846
Tender Fee 16534
EMD 1.44 Lakh
Tender Value -
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=387494

Start Date February 03, 2024 16:00
End Date
Expired 09/02/2024

Expired 940 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restructuring of dedicated corridor to mix lane corridor brts package 1 misrod to ampri

Restructuring of dedicated corridor to mix lane corridor brts package 1 misrod to ampri

Read more
Restructuring of dedicated corridor to mix lane corridor brts package 3 collectorate to lalghati

Restructuring of dedicated corridor to mix lane corridor brts package 3 collectorate to lalghati

Read more
Repairing and maintenance of dedicatred lane and bus stop on brts corridor no 1.

Repairing and maintenance of dedicatred lane and bus stop on brts corridor no 1.

Read more
In hariparvat zone, ward no. 80, in kamla nagar hydel colony, road construction work will be carried out using hot mix asphalt in the lane next to the park.

In hariparvat zone, ward no. 80, in kamla nagar hydel colony, road construction work will be carried out using hot mix asphalt in the lane next to the park.

Read more
Package no elevated corridor_jorhat/assam/01 construction of 3-lane elevated corridor on a t road from barua chariali to bhogdoi bridge in jorhat district of assam

Package no elevated corridor_jorhat/assam/01 construction of 3-lane elevated corridor on a t road from barua chariali to bhogdoi bridge in jorhat district of assam

Read more
Development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh116a (package 5) in the state of west bengal under ham mode.

Development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh116a (package 5) in the state of west bengal under ham mode.

Read more
Development of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode

Development of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Read more
Cs for ae for cons. of 6 lane elevated corridor from 612.582 to km 617.540 including cons. of dedicated flyover towards kolhapur city on nh 48 in flood affected zone of kolhapur (descoped work of kagal satara pkg1). 2nd level ramp(0.000-1.263) in mh

Cs for ae for cons. of 6 lane elevated corridor from 612.582 to km 617.540 including cons. of dedicated flyover towards kolhapur city on nh 48 in flood affected zone of kolhapur (descoped work of kagal satara pkg1). 2nd level ramp(0.000-1.263) in mh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise