Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Iv Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Hot Air Duct At 45 Mtr And 18 Mtr Level For Mills 4 A To 4 F During Aoh 2024 25
|
Description |
Mtps I Mill Plant Unit Iv Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Hot Air Duct At 45 Mtr And 18 Mtr Level For Mills 4 A To 4 F During Aoh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463105_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.94/ 2024-25 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550367 |
Start Date | July 16, 2024 14:30 |
End Date |
22/07/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit iv removal of worn out thinned out wall plates of bunkers 4b 4d 4f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit iv removal of worn out thinned out wall plates of bunkers 4b 4d 4f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes to boiler corner 1 to 4 to 180 deg at 16 meter level near boiler area during capital overhaul 2024 25
Mtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes to boiler corner 1 to 4 to 180 deg at 16 meter level near boiler area during capital overhaul 2024 25
Read moreMtps i mill plant unit ii filtration and purification of the contaminated gear box oil of the coal mills 2a to 2f during coh 2024 25
Mtps i mill plant unit ii filtration and purification of the contaminated gear box oil of the coal mills 2a to 2f during coh 2024 25
Read moreMtps i mill plant reconditioning of worn out upper journal housing released from unit i to iv mills
Mtps i mill plant reconditioning of worn out upper journal housing released from unit i to iv mills
Read moreMtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a
Mtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a
Read moreMtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes of mills 2a 2b 2d 2e 2f to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
Mtps i mill plant unit ii coal flow system to boiler rotating the existing eroded straight coal pipes of mills 2a 2b 2d 2e 2f to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
Read moreMtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft renewal of worm gear hub in any one mill from 4a to 4f tilt
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft renewal of worm gear hub in any one mill from 4a to 4f tilt
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Read moreMtps i mill plant ac plant unit ii coh 2024 25 air washer system epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 nb gi header pipe vibration pads overhauling the blower 2
Mtps i mill plant ac plant unit ii coh 2024 25 air washer system epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 nb gi header pipe vibration pads overhauling the blower 2
Read moreMtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seals during capital overhaul 2024 25
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seals during capital overhaul 2024 25
Read moreof your Industry type