Tender Details

About Tender

🏭 Tender Announcement For Mtps I Mill Plant Unit Iii Maintenance Services 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Maintenance Services Of Mtps I Mill Plant Unit Iii, Specifically For The Removal Of Accumulated Ash From The Mill Inlet Hot Air Duct At 4.5 Meters And 18 Meters Levels, As Well As The Renewal Of Eroded And Worn Out Expansion Joints 3 A, 3 B, And 3 F. 📅 Bid Submission Deadline: April 19, 2024, 2:00 Pm Tender Fee: Inr 16,000 Interested Bidders Are Required To Submit Detailed Proposals, Including Methodologies For Ash Removal, The Condition Of The Expansion Joints, And A Comprehensive Plan For Their Renewal. Keywords: Mtps I Mill Plant Unit Iii, Maintenance Services, Ash Removal, Expansion Joints, Tneb Limited, Power Station, State Government Undertaking, Tender, Bid Submission
Particulars Details
Title
Mtps I Mill Plant Unit Iii Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Hot Air Duct At 4 5 Mtr And 18 Mtr Level Renewal Of Eroded Worn Out Expansion Joint 3 A 3 B And 3 F Etc
Description
Mtps I Mill Plant Unit Iii Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Hot Air Duct At 4 5 Mtr And 18 Mtr Level Renewal Of Eroded Worn Out Expansion Joint 3 A 3 B And 3 F Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_428538_1
Reference
Number
CE / MTPS-I / SE/ M-I /MP/OT. 432 /2023-24
Tender Fee 0
EMD 16000
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509554
Start Date February 21, 2024 21:30
End Date

19/04/2024 ( Expired 444 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Read more
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion

Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion

Read more
Mtps i bm unit ii coh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides

Mtps i bm unit ii coh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides

Read more
Mtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides

Mtps i bm unit ii coh 2024 25 strengthening of the eroded portions of esp hopper id fan casing fg duct from esp inlet to chimney and renewal of deflector plate in the id fan outlet side fg duct and other related works in both a and b sides

Read more
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air

Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air

Read more
Mtps i mill plant unit iii complete inspection of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 3d

Mtps i mill plant unit iii complete inspection of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 3d

Read more
Mtps i mill plant unit iii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any one of the

Mtps i mill plant unit iii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any one of the

Read more
Mtps i mill plant unit iii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 3a

Mtps i mill plant unit iii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 3a

Read more
Mtps i mill plant unit iv removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 45 mtr and 18 mtr level for mills 4a to 4f during aoh 2024 25

Mtps i mill plant unit iv removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 45 mtr and 18 mtr level for mills 4a to 4f during aoh 2024 25

Read more
Mtps i bm unit iv rotating parts removal of deteriorated and peeled off insulation and renewal with new insulation materials in id fans 4a and 4b outlet vertical duct chimney horizontal duct id fan a and b inlet common duct header top front and rear

Mtps i bm unit iv rotating parts removal of deteriorated and peeled off insulation and renewal with new insulation materials in id fans 4a and 4b outlet vertical duct chimney horizontal duct id fan a and b inlet common duct header top front and rear

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise