Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Pa Hot Air Duct At 4 5 Mtr 18 Mtr Level For Mills 2 A To 2 F During Annual Overhaul 2026 27
|
| Description |
Mtps I Mill Plant Unit Ii Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Pa Hot Air Duct At 4 5 Mtr 18 Mtr Level For Mills 2 A To 2 F During Annual Overhaul 2026 27
|
| Organisation | TNEB Limited | TANGEDCO | CE-MTPS-I - TANGEDCO | SE-Mechanical Maintenance I-MTPS-I - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 1200 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 01, 2026 22:30 |
| End Date |
Closing soon
15/10/2026
2 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2026 27
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27
Mtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreof your Industry type