Tender Details
Particulars | Details |
---|---|
Title |
Provision Of Additional One Span (1 X3.66m) Minor Bridge At Canal Bridge No.80 At Km 60/3 4 Between Noh Szn Station Of Pilibhit Shahjahanpur Section Under Aden/Pbe.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77308837 |
Reference Number |
NER-IZN-2024-150 |
Tender Fee | 0 |
EMD | 1.9 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77308837/viewNitPdf_4708972.pdf |
Start Date | September 12, 2024 19:22 |
End Date |
07/10/2024 ( Expired 220 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreStrengthening of r-80 perambur- sethur road km 0/000 - 4/200in kuthalam block at mayiladuthurai district under mgsmt 2025-2026 (package no 5)
Strengthening of r-80 perambur- sethur road km 0/000 - 4/200in kuthalam block at mayiladuthurai district under mgsmt 2025-2026 (package no 5)
Read moreRenovation of pipe fall structure at ch-65.00 of minor-b of dy no-4 of k.m.c(l) mouza-sarenga, block-sarenga, dist-bankura under head quarter section of k.c. sub division no-iv under k.c. division no-1 amlagora, paschim medinipur during 2025-2026.
Renovation of pipe fall structure at ch-65.00 of minor-b of dy no-4 of k.m.c(l) mouza-sarenga, block-sarenga, dist-bankura under head quarter section of k.c. sub division no-iv under k.c. division no-1 amlagora, paschim medinipur during 2025-2026.
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreRepair and servicing of c.r. gate (size 5.4 m x 4.2 m x 4 nos) of i.s.p. canal rd 140.085 km under nd canal division khargone at nd e/m sub division no. 31 sanawad, district khargone including material, labour charges and testing etc. complete work.
Repair and servicing of c.r. gate (size 5.4 m x 4.2 m x 4 nos) of i.s.p. canal rd 140.085 km under nd canal division khargone at nd e/m sub division no. 31 sanawad, district khargone including material, labour charges and testing etc. complete work.
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreStrenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreGeneral wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
Read moreReconstruction of damaged and narrow minor bridge and approach road on modi mill drain located at km-3 (kavi) of nh-24 to pilkhua phagota road via kavi, ahmedpur road under rajya yojana during the financial year 2024-25
Reconstruction of damaged and narrow minor bridge and approach road on modi mill drain located at km-3 (kavi) of nh-24 to pilkhua phagota road via kavi, ahmedpur road under rajya yojana during the financial year 2024-25
Read moreof your Industry type