Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Works To The South Side Drain In 275 N Road From Unit 3 Compound Wall Up To The Entrance Of Switchyard 2 Barricade Ch 0 M To Ch 170 M Reach 1 In Unit 4 And 5 Area
|
| Description |
Improvement Works To The South Side Drain In 275 N Road From Unit 3 Compound Wall Up To The Entrance Of&Amp#X0d
Switchyard 2 Barricade Ch 0 M To Ch 170 M Reach 1 In&Amp#X0d
Unit 4 And 5 Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_505838_1 |
|
Reference Number |
CE SE C TTPS Spec. No 231 24 25 |
| Tender Fee | 0 |
| EMD | 7000 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=601793 |
| Start Date | November 29, 2024 23:30 |
| End Date |
Expired
17/12/2024
Expired 663 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification works by providing rcc drain to the south of 275 n road from switchyard barricade upto 457.5 e road near ash dyke gate
Rectification works by providing rcc&#x0d drain to the south of 275 n road from switchyard barricade&#x0d upto 457.5 e road near ash dyke gate
Read moreRepair works to the barricade gate in the north side of switchyard 2 in 275 n road in a zone area
Repair works to the barricade gate in the north side of switchyard 2 in 275 n road in a zone area
Read moreImprovement works to south side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Improvement works to south side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Read moreRectification works to fully damaged 457.5 e bt road in unit 4 and 5area from ash dyke gate culvert towards unit 5 entrance barricade from ch 125 m to 190 m reach 3
Rectification works to fully damaged 457.5 e bt road in unit 4 and 5area from ash dyke gate culvert towards unit 5 entrance barricade from ch 125 m to 190 m reach 3
Read moreRectification works to fully damaged 457.5 e bt road in unit 4 and 5 area from ash dyke gate culvert towards unit 5 entrance barricade from ch 0 m to 60 m reach 1
Rectification works to fully damaged 457.5 e bt road in unit 4 and 5 area from ash dyke gate culvert towards unit 5 entrance barricade from ch 0 m to 60 m reach 1
Read moreRectification works to fully damaged 457.5 e bt road in unit 4 and 5 area from ash dyke gate culvert towards unit 5 entrance barricade from ch 60 m to 125 m reach 2
Rectification works to fully damaged 457.5 e bt road in unit 4 and 5 area from ash dyke gate culvert towards unit &#x0d 5 entrance barricade from ch 60 m to 125 m reach 2
Read moreClearing the scrub jungle in the 275 n road north side of switchyard 2 building in unit 4 and 5 area
Clearing the scrub&#x0d jungle in the 275 n road north side of switchyard 2 building in unit 4 and 5 area
Read moreRaising the rcc wall in the south side of cooling water closed channel 2 from eastern side compound wall ch 0 mtr to 180 mtr reach 1
Raising the rcc wall&#x0d in the south side of cooling water closed channel 2 from&#x0d eastern side compound wall ch 0 mtr to 180 mtr reach 1
Read moreRaising the rcc wall in the south side of cooling water closed channel 2 from eastern side compound wall ch 720 mtr to 900 mtr reach 5
Raising the rcc wall&#x0d in the south side of cooling water closed channel 2 from eastern side compound wall ch 720 mtr to 900 mtr reach 5
Read moreRaising the rcc wall in the south side of cooling water closed channel 2 from eastern side compound wall ch 540 mtr to 720 mtr reach 4
Raising the rcc wall&#x0d in the south side of cooling water closed channel 2 from eastern side compound wall ch 540 mtr to 720 mtr reach 4
Read moreof your Industry type