Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rectification Works To Fully Damaged 457.5 E Bt Road In Unit 4 And 5 Area From Ash Dyke Gate Culvert Towards Unit 5 Entrance Barricade From Ch 60 M To 125 M Reach 2
|
Description |
Rectification Works To Fully Damaged 457.5 E Bt Road In Unit 4 And 5 Area From Ash Dyke Gate Culvert Towards Unit &Amp#X0d
5 Entrance Barricade From Ch 60 M To 125 M Reach 2
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_508556_1 |
Reference Number |
CE SE C TTPS Spec. No 243 24 25 |
Tender Fee | 0 |
EMD | 6900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604919 |
Start Date | December 07, 2024 23:30 |
End Date |
21/12/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection arrangements by strengthening and raising the existing bund towards a1 dyke from east side culvert for a length of 200 m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from east side culvert for a&#x0d length of 200 m in ash dyke area at ttps
Read moreStrengthening and raising the existing bund in the primary pond from ch 655m to ch 765m for hump towards main spillway for a length of 110m in ash dyke area
Strengthening and raising the existing bund in the primary&#x0d pond from ch 655m to ch 765m for hump towards main&#x0d spillway for a length of 110m in ash dyke area
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack (pcr 5) support columns from unit 3 compound wall to esp 4 rear side up to chimney 3
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack (pcr 5) support columns from unit 3 compound wall&#x0d to esp 4 rear side up to chimney 3
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&#x0d dyke area at ttps
Read moreRectification of the damaged culvert and providing new rcc culvert in the approach road to switchyard 2 from 275 n road in unit 4 and 5 area
Rectification of the damaged culvert and providing new rcc&#x0d culvert in the approach road to switchyard 2 from 275 n road in unit 4 and 5 area
Read moreBt
Recarpeting of damaged bt roads from a) metro pillar no.a1139, pranava group to a1144 nova ent hospital, errum manzil, b) underneath khairtabad metro station towards lakdikapool, c) 6-3-1089/g/16 to villa marie college entrance, d) sbh colony, yellareddyguda, e) 5 rupee meal er to north east gate of secretariat under circle-17, kz, ghmc (item 1)
Read moreRectification works by attending patchup to the existing damaged 457.5 e bt road from unit 4 and 5 entrance to jt 3 building towards south side at ttps
Rectification works by attending patchup&#x0d to the existing damaged 457.5 e bt road from unit 4 and 5&#x0d entrance to jt 3 building towards south side at ttps
Read moreRectification works to the existing damaged bt road from type 3 block no.4 to type 4block no.1 and type 3 block no.6 to type 3 block no.1 at thermal nagar
Rectification works to the existing damaged bt road from type 3 block no.4 to type 4block&#x0d no.1 and type 3 block no.6 to type 3 block no.1 at thermal nagar
Read moreCleaning the septic tanks at various locations in unit 4 and 5 a zone area and offices lying to the east of 457.5 e road in stage 3 area for the period from 01.04.2025 to 31.03.2026
Cleaning&#x0d the septic tanks at various locations in unit 4 and 5 a zone&#x0d area and offices lying to the east of 457.5 e road in stage 3&#x0d area for the period from 01.04.2025 to 31.03.2026
Read moreProtection of ash dyke in ash bund area for units 4 and 5 and also regulating the flow in the existing spillway for the period from 01.04.2025 to 31.03.2026
Protection of ash dyke in ash bund area for units 4 and 5 and&#x0d also regulating the flow in the existing spillway for the period&#x0d from 01.04.2025 to 31.03.2026
Read moreof your Industry type