Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rectification Works To Fully Damaged 457.5 E Bt Road In Unit 4 And 5area From Ash Dyke Gate Culvert Towards Unit 5 Entrance Barricade From Ch 125 M To 190 M Reach 3
|
Description |
Rectification Works To Fully Damaged 457.5 E Bt Road In Unit 4 And 5area From Ash Dyke Gate Culvert Towards Unit 5 Entrance Barricade From Ch 125 M To 190 M Reach 3
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_508572_1 |
Reference Number |
CE SE C TTPS Spec. No 260 24 25 |
Tender Fee | 0 |
EMD | 6900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604939 |
Start Date | December 07, 2024 23:30 |
End Date |
21/12/2024 ( Expired 183 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along west side of trench
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack pr 4 support columns in unit 4 esp to chimney 3&#x0d along west side of trench
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe&#x0d rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench
Read moreRectification works by attending patchup to the existing damaged 457.5 e bt road from unit 4 and 5 entrance to jt 3 building towards south side at ttps
Rectification works by attending patchup&#x0d to the existing damaged 457.5 e bt road from unit 4 and 5&#x0d entrance to jt 3 building towards south side at ttps
Read moreRectification works to the existing damaged bt road from type 3 block no.4 to type 4block no.1 and type 3 block no.6 to type 3 block no.1 at thermal nagar
Rectification works to the existing damaged bt road from type 3 block no.4 to type 4block&#x0d no.1 and type 3 block no.6 to type 3 block no.1 at thermal nagar
Read moreRectification works to the existing damaged bt road from type 1 block no.41 to block no.44,6mg 3 to block no.44 and gym to block no.42 and dispensary to block no.41 road at thermal nagar
Rectification works to the existing damaged bt road from type 1 block no.41 to block no.44,6mg 3 to block no.44 and gym to block no.42 and dispensary to&#x0d block no.41 road at thermal nagar
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreCleaning the septic tanks at various locations in unit 4 and 5 a zone area and offices lying to the east of 457.5 e road in stage 3 area for the period from 01.04.2025 to 31.03.2026
Cleaning&#x0d the septic tanks at various locations in unit 4 and 5 a zone&#x0d area and offices lying to the east of 457.5 e road in stage 3&#x0d area for the period from 01.04.2025 to 31.03.2026
Read moreCleaning the roof tops of various buildings such as power house, ash handling, boiler, bunker esp4 and 5 control room cwph 2 of unit 4 and 5 at el 3.00m to 52.80 m and clearing away the deposits to far off places for the period from 01.04.202
Cleaning&#x0d the roof tops of various buildings such as power house, ash&#x0d handling, boiler, bunker esp4 and 5 control room cwph 2&#x0d of unit 4 and 5 at el 3.00m to 52.80 m and clearing away the&#x0d deposits to far off places for the period from 01.04.202
Read moreof your Industry type