Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmda/Civil/Housing/Se/C Iv/03 Of 2024 25 (2nd Call), Date. 18.11.2024
|
| Description |
Design, Drawing, Supplying, Laying And Testing Of Water Supply Network For Footwear Park At Calcutta Leather Complex(clc), Bantala, 24 Pgs(south) In Turnkey Basis.(2nd Call)
|
| Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
| Tender Id | 2024_KMDA_770345_1 |
|
Reference Number |
KMDA/CIVIL/HOUSING/SE/C-IV/03 of 2024-25 (2nd call), Date. 18.11.2024 |
| Tender Fee | 0 |
| EMD | 2.19 Lakh |
| Tender Value | - |
| Place | Calcutta Leather Complex,Bantala, Kolkata |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1705873 |
| Start Date | November 29, 2024 23:00 |
| End Date |
Expired
23/12/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of conference hall at vikarabad of vikarabad district (balance work). 2nd call
Construction of conference hall at vikarabad of vikarabad district (balance work). 2nd call
Read moreConstruction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)
Construction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreProviding of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Read moreProviding of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc categ
Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc category).
Read more03/nit/ee/divn-iv/housing/kmda (2nd call) of 2024-25 dt. 18.11.2024
Repairing and renovation works of the office of the chief engineer and executive engineer, r.e. div-iv, housing sector, kmda at l- block, 2nd floor unnayan bhawan.(2nd call)
Read moreKmda/civil/housing/se/c-iv/03 of 2023-24, date. 02.08.2023
Design, drawing, construction and commissioning of complete water supply system in turnkey basis under infrastructural development works at footwear park in calcutta leather complex, bantala, at 24 pgs(s) (part-ii)
Read moreKmda/civil/housing/se/c-iv/03 of 2025-26, date. 07.05.2025
Design, drawing, construction and commissioning of basic common infrastructural works for proposed leather goods and allied industrial park (lg aip) on turn key basis in calcutta leather complex (clc) at bantala, 24 parganas (south) (part iii)
Read moreKmda/civil/housing/se/c-iv/11 (2nd call) of 2023-24, date. 04.01.2024
Design, drawing, construction and commissioning of water supply works in turnkey basis at added area, zone-10a and zone-11 in calcutta leather complex, bantala, 24 parganas(south) (2nd call)
Read moreof your Industry type