Tender Details
Particulars | Details |
---|---|
Title |
Repairing R.C.C. Pipe Line, Chember, Volve Between Ch.0 To 1000m, Of R.B.C. Canal And P.V.C. Line From Out Let 13, And L.B.C.From Ch. 1300 M. Of Velholi M. I. Scheme , Tal. Shahapur, Dist. Thane .
|
Description |
Repairing R.C.C. Pipe Line, Chember, Volve Between Ch.0 To 1000m, Of R.B.C. Canal And P.V.C. Line From Out Let 13, And L.B.C.From Ch. 1300 M. Of Velholi M. I. Scheme , Tal. Shahapur, Dist. Thane .
|
Organisation | CE-Water Resources Dept. Konkan Region Mumbai | State Govt. and UT |
Tender Id | 2025_CWRDK_1168700_1 |
Reference Number |
Tender Notice No. 15_6 for 2024-25 |
Tender Fee | 2860 |
EMD | 16800 |
Tender Value | |
Place | Velholi |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2030874 |
Start Date | April 08, 2025 16:30 |
End Date |
15/04/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Wadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dm no 07 on right bank canal at ch 13045 m
Wadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dm no 07 on right bank canal at ch 13045 m
Read moreRepairing r.c.c. pipe line, chember, volve between ch.0 to 1000m, of r.b.c. canal and p.v.c. line from out let 13, and l.b.c.from ch. 1300 m. of velholi m. i. scheme , tal. shahapur, dist. thane .
Repairing r.c.c. pipe line, chember, volve between ch.0 to 1000m, of r.b.c. canal and p.v.c. line from out let 13, and l.b.c.from ch. 1300 m. of velholi m. i. scheme , tal. shahapur, dist. thane .
Read moreRepairing and renovation of observation bunglow for jambhe m.i. scheme, tal shahapur, dist. thane
Repairing and renovation of observation bunglow for jambhe m.i. scheme, tal shahapur, dist. thane
Read moreAachara parwadi kharland scheme tal malvan dist. sindhudurg. restoration of bund from ch. 0 m to ch. 400 m and renovation of cd work at ch. 145 m
Aachara parwadi kharland scheme tal malvan dist. sindhudurg. restoration of bund from ch. 0 m to ch. 400 m and renovation of cd work at ch. 145 m
Read more2402 e and i repairing and strenghtening of sg at ch.1450 m of shirgaon kothe k. l. scheme tal- vasai dist- palgar.
2402 e and i repairing and strenghtening of sg at ch.1450 m of shirgaon kothe k. l. scheme tal- vasai dist- palgar.
Read moreRepairing and maintenance of pipe line and pump house with redrilling of tube well including necessary supply at barhatti mdtw (m/26/m) scheme at bharatpur-ii block within berhampore- ii(a-i) division under core-sector (sarasari mukhamantri) program
Repairing and maintenance of pipe line and pump house with redrilling of tube well including necessary supply at barhatti mdtw (m/26/m) scheme at bharatpur-ii block within berhampore- ii(a-i) division under core-sector (sarasari mukhamantri) program
Read moreRestoration of bund in between ch.0 m. to 650 m. and construction of pipe s.g. at ch. 10m. for protection of shirvali village tal. alibaug dist. raigad
Restoration of bund in between ch.0 m. to 650 m. and construction of pipe s.g. at ch. 10m. for protection of shirvali village tal. alibaug dist. raigad
Read moreConstruction of mhapral kharland scheme tal mandangad dist ratnagiri construction of earthen bund between ch 0 to 1020 m and construction of s g ch 645 m for part 1 and construction of earthen bund between ch 0 to 410 m and construction of s g c
Construction of mhapral kharland scheme tal mandangad dist ratnagiri construction of earthen bund between ch 0 to 1020 m and construction of s g ch 645 m for part 1 and construction of earthen bund between ch 0 to 410 m and construction of s g c
Read moreGul medium project - construction and repairing of earthwork and wingwall on u/s of slab drain at ch 2475 m of gul rbc main canal tal chopda dist jalgaon.
Gul medium project - construction and repairing of earthwork and wingwall on u/s of slab drain at ch 2475 m of gul rbc main canal tal chopda dist jalgaon.
Read moreRepairing ,maintanance and extention work of upvc pipe line of ahiron rli scheme of suti-i block under lalgola(a-m) sub-division
Repairing ,maintanance and extention work of upvc pipe line of ahiron rli scheme of suti-i block under lalgola(a-m) sub-division
Read moreof your Industry type