Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Service Contract For Installation Of New Bunker Sealing Belt, Removal Of Existing Sealing Belt And Re Installation Of Existing Sealing Belt Of Bktpp
|
| Description |
Service Contract For Installation Of New Bunker Sealing Belt, Removal Of Existing Sealing Belt And Re Installation Of Existing Sealing Belt Of Bktpp
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_821918_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E3618/24-25 |
| Tender Fee | 0 |
| EMD | 21419 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1828587 |
| Start Date | March 18, 2025 16:30 |
| End Date |
Expired
31/03/2025
Expired 521 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Replacement of existing smoke tubes in 4tph fire tube boiler reg.no.mys-1982 including supply, removal, installation, testing, and commissioning at bengaluru dairy
Read moreCustom bid for services - 400051468 laying of conveyor belt bunker sealing belt vgtu blocks of conv
Read more
Installation of new welding receptacles at chp area,bktpp
Installation of new welding receptacles at chp area,bktpp
Read moreRemoval for existing rain gutter and fabrication supply installation of new gi rain gutter
Removal for existing rain gutter and fabrication supply installation of new gi rain gutter
Read moreCustom bid for services - 200142635 removal of damaged sheet re installation of new cladding roof s
Read more
Removal of old existing tin shed,segregation of good condition old cgi sheets,installation of new c
Read more
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion ( small belt) at gevra project of gevra area.
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion ( small belt) at gevra project of gevra area.
Read moreAnnual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Read moreof your Industry type