Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Cleaning And Removal Of Deposited Silt From Existing Drains And Floor Conveyor Belt Of P1 Q1, P2 Q2 And P3 Q3 Series Including Cross Drainage Of Bunker Portion ( Small Belt) At Gevra Project Of Gevra Area.
|
| Description |
Annual Cleaning And Removal Of Deposited Silt From Existing Drains And Floor Conveyor Belt Of P1 Q1, P2 Q2 And P3 Q3 Series Including Cross Drainage Of Bunker Portion ( Small Belt) At Gevra Project Of Gevra Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_299415_1 |
|
Reference Number |
SECL/GA/GM(C)/ETN /23-24/138 Dt 23/01/2024 |
| Tender Fee | 0 |
| EMD | 1.08 Lakh |
| Tender Value | - |
| Place | Gevra Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310161 |
| Start Date | January 26, 2024 16:30 |
| End Date |
Expired
10/02/2024
Expired 934 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Annual cleaning and removal of deposited silt from existing drains and floor conveyor belt of p1q1, p2q2 and p3q3 series including cross drainage of bunker portion (small belt) at gevra project of gevra area
Read moreAnnual assistance jobs for clearning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area
Annual assistance jobs for clearning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area
Read moreAnnual assistance jobs for cleaning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area.(2nd call)
Annual assistance jobs for cleaning and removal of deposited silt from existing drains, and floors of conveyor belt of jk series including cross drains of bunker portion (small belt) at gevra project of gevra area.(2nd call)
Read moreUrgent cleaning of silt/muck/slush etc from conveyor belt series at gevra project of gevra area.
Urgent cleaning of silt/muck/slush etc from conveyor belt series at gevra project of gevra area.
Read moreRepairing of tail end pulley foundation of j2 belt conveyor at gevra project of gevra area
Repairing of tail end pulley foundation of j2 belt conveyor at gevra project of gevra area
Read moreProviding rcc drain and retaining wall along m1-m5 series conveyor near silo 3 and 4 under gevra project of gevra area
Providing rcc drain and retaining wall along m1-m5 series conveyor near silo 3 and 4 under gevra project of gevra area
Read moreStrengthening of bunker, trestle and gantry portion of belt conveyor system of chp bhadra 7 and 8 mine jamuna kotma area.
Strengthening of bunker, trestle
 and gantry portion of belt conveyor
 system of chp bhadra 7 and 8 mine
 jamuna kotma area.
Read moreCustom bid for services - 400051468 laying of conveyor belt bunker sealing belt vgtu blocks of conv
Read more
Erection of 6.6kv overhead line from khusrudih substation, to feed power to new substation of ab series conveyor belt line under chp- backup of gevra project.
Erection of 6.6kv overhead line from khusrudih substation, to feed power to new substation of ab series conveyor belt line under chp backup of gevra project.
Read moreFabrication, and erection of steel structure of c and r series of conveyor, gantry and ground bunker 30000 te and 5000 te for strengthening as per ndt recommendations of back up gevra project.
Fabrication, and erection of steel structure of c and r series of conveyor, gantry and ground bunker 30000 te and 5000 te for strengthening as per ndt recommendations of back up gevra project.
Read moreof your Industry type