Tender Details
Particulars | Details |
---|---|
Title |
Protection Work In Between Rd Plus/Minus 3800 To 3900 And Behind At Spur Rd 3900 Towards Village Sailanigot Right Bank Of River Sharda
|
Description |
Protection Work In Between Rd Plus/Minus 3800 To 3900 And Behind At Spur Rd 3900 Towards Village Sailanigot Right Bank Of River Sharda
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NHPC_833488_1 |
Reference Number |
NH/TPS/PnC/NIT/2024 /E128204/1044/470 dt 04/11/2024 |
Tender Fee | 1180 |
EMD | 1.09 Lakh |
Tender Value | |
Place | NHPC Ltd. Tanakpur Power Station, Banbasa |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=875885 |
Start Date | November 05, 2024 17:00 |
End Date |
26/11/2024 ( Expired 147 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreConstruction of cc road and drain from punjab national bank to shri ram house in ward no 7 at nagar panchayat ugu,unnao.
Construction of cc road and drain from punjab national bank to shri ram house in ward no 7 at nagar panchayat ugu,unnao.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreNiet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreAAAAAAAAAA
Login to viewProtection work along&#x0d right bank of river padma&#x0d from house of islam uddin to bsf camera post (length 500m) at radhakrishnapur within g.p.- bilborakopara,&#x0d block and p.s.- lalgola,&#x0d dist. murshidabad
Read moreof your Industry type