Tender Details
Particulars | Details |
---|---|
Title |
8/T Of 23 24 Of Ae/Besd
|
Description |
Installation Of Centralized Electric Warning Bell System For All Non Interconnected School Building At Barasat Pcs Govt. High School, North 24 Pgs.
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPWD_541908_1 |
Reference Number |
8/T of 23-24 of AE/BESD |
Tender Fee | |
EMD | 2861 |
Tender Value | |
Place | OFFICE OF THE ASSISTANT ENGINEER P.W.D BARASAT |
Link | https://wbtenders.gov.in |
Start Date | June 12, 2023 23:30 |
End Date |
23/06/2023 ( Expired 705 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreJp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreJp/b957-540-cv-t-8201/1018 polymer warehouse package for bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Polymer warehouse package for bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Read moreJp/b957-500-mb-t-6600/1017 - sphere package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Sphere package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Read moreof your Industry type