Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Amc Services For 2 Years For Cathodic Protection System For Ms Vs Available At 54 Existing Iocl Lpg B Ps And 16 Lpg B Ps Where New Ms Vs Are Expected To Come Under Amc After Successful Completion Of Defect Liability Period Across India
|
| Description |
Providing Amc Services For 2 Years For Cathodic Protection System For Ms Vs Available At 54 Existing Iocl Lpg B Ps And 16 Lpg B Ps Where New Ms Vs Are Expected To Come Under Amc After Successful Completion Of Defect Liability Period Across India
|
| Organisation | IndianOil Corporation Limited(IOCL) |
| Tender Id | 2023_MKTHO_168395_1 |
|
Reference Number |
HCC/LPG-4/PT-28/23-24 |
| Tender Fee | |
| EMD | 0 |
| Tender Value | |
| Place | IOCL HO Mumbai |
| Link |
View Original Tender Notice
https://iocletenders.nic.in |
| Start Date | August 04, 2023 20:30 |
| End Date |
Expired
18/08/2023
Expired 1022 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Water supply scheme for augmentation of uwss sanchore district sanchore including 05 years o and m after 01 year defect liability period under amrut 2
Water supply scheme for augmentation of uwss sanchore district sanchore including 05 years o and m after 01 year defect liability period under amrut 2 &#x0d &#x0d
Read moreGroup-b-modification of existing ge-emerson plc based control system at chennai, asanur, sankari stations of cbrapl and sankari irugur and annual maintenance contract for a period of five years after defect liability period
Group-b-modification of existing ge-emerson plc based control system at chennai, asanur, sankari stations of cbrapl and sankari irugur and annual maintenance contract for a period of five years after defect liability period
Read moreSditc of 2 sets of 50 hp vertical turbine pump along with suitable induction motor with a defect liability period of 2 years and non comprehensive maintenance contract for 5years(for new pump 3 years after dlp) for 2 nos. new installed pumps of hdc
Sditc of 2 sets of 50 hp vertical turbine pump along with suitable induction motor with a defect liability period of 2 years and non comprehensive maintenance contract for 5years(for new pump 3 years after dlp) for 2 nos. new installed pumps of hdc
Read moreDnit for design, construction, erection, testing, commissioning, operation and maintenance for 15 years after defect liability period for transfer of 60mld treated waste water from 25mld and 35mld stps siwah to existing hsvp tanks in sector 29 ,m.c.p
Dnit for design, construction, erection, testing, commissioning, operation and maintenance for 15 years after defect liability period for transfer of 60mld treated waste water from 25mld and 35mld stps siwah to existing hsvp tanks in sector 29 ,m.c.p
Read moreWork for sitc of 02 nos of new lifts having 15 passenger capacity each after dismantling of existing old lifts, including one year defect-cum- maintenance period and thereafter comprehensive amc for next five years at hsiidc head office panchkula
Work for sitc of 02 nos of new lifts having 15 passenger capacity each after dismantling of existing old lifts, including one year defect-cum- maintenance period and thereafter comprehensive amc for next five years at hsiidc head office panchkula
Read moreNit for sitc of 10 hp, 4 nos hvac (vrv vrf) ac system at 4 nos bank,residential flats commonwealth games village, new delhi (works including 3 years camc after 1 year of defect liability period)
Nit for sitc of 10 hp, 4 nos hvac (vrv vrf) ac system at 4 nos bank,residential flats commonwealth games village, new delhi (works including 3 years camc after 1 year of defect liability period)
Read moreUpgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef
Read moreof your Industry type