Tender Details
Particulars | Details |
---|---|
Title |
Remaining And Balance Work Of Construction Of Two (02) Lane Rob In Lieu Of Lc No. 44 (Gulab Bari Fatak) At Rly. Km. 291/3 4 Between Madar Ajmer Stations (Excluding Cost Of Cement)
|
Description |
Remaining And Balance Work Of Construction Of Two (02) Lane Rob In Lieu Of Lc No. 44 (Gulab Bari Fatak) At Rly. Km. 291/3 4 Between Madar Ajmer Stations (Excluding Cost Of Cement)
|
Organisation | RSRDCC-GM | State Govt. and UT |
Tender Id | 2024_RSRDC_410701_1 |
Reference Number |
RSRDCC NIT 113/2024-25 DATED 31.07.2024 |
Tender Fee | 14300 |
EMD | 42.3 Lakh |
Tender Value | |
Place | Madar Ajmer Stations |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=739335 |
Start Date | August 14, 2024 16:30 |
End Date |
30/09/2024 ( Expired 204 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreConstruction of rob at km 1/2 of mannarai - thottimannarai road in lieu of existing lc.no.131 at railway km 438/4-6 in between uthukuli and tiruppur railway stations.
Construction of rob at km 1/2 of mannarai - thottimannarai road in lieu of existing lc.no.131 at railway km 438/4-6 in between uthukuli and tiruppur railway stations
Read moreProviding median closings between munneru hlb to rob from km 4/0 to 4/3 (blockspot id no tg-05-181), and ayyapa swamy temple from km 8/2-4 (blockspot id tg-02-117) on khammam -aswaraopeta section of nh-365bb in the state of telangana
Providing median closings between munneru hlb to rob from km 4/0 to 4/3 (blockspot id no tg-05-181), and ayyapa swamy temple from km 8/2-4 (blockspot id tg-02-117) on khammam -aswaraopeta section of nh-365bb in the state of telangana
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreHubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreGy-wd section : proposed construction of 2-lane road over bridges in lieu of lc no.213 at km 547/4-5 at matamari station yard, lc no.215 at km 552/8-9 between matamari - marichehal stations, lc no.225 at km 608/8-9 at saidapur station yard, lc no.227 at km 622/7-8 at lingiri station yard.
For complete deion and other details, please refer to tender
Read moreof your Industry type