Tender Details

Particulars Details
Title
Construction Of Remaining Work Rob In Lieu Lc No. 265 (Railway Km. 301.024) On Sikar Jhunjhunu Luharu Road (Excluding Cost Of Cement).
Description
Construction Of Remaining Work Rob In Lieu Lc No. 265 (Railway Km. 301.024) On Sikar Jhunjhunu Luharu Road (Excluding Cost Of Cement).
Organisation RSRDCC-GM | State Govt. and UT
Tender Id 2025_RSRDC_461620_1
Reference
Number
RSRDCC NIT 031/2025-26 DATED 17.04.2025
Tender Fee 14300
EMD 64.96 Lakh
Tender Value
Place Sikar-Jhunjhunu-Luharu Road
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=828247

Start Date May 06, 2025 16:30
End Date
Expired 15/05/2025

Expired 411 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india

Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &amp#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &amp#x0d panchayat amethi distt lucknow up india

Read more
Additional work of remaining work construction of rob (excluding railway portion) for lc no. 38 at baran

Additional work of remaining work construction of rob (excluding railway portion) for lc no. 38 at baran

Read more
Construction of lhs in lieu of lc no 284 rob in lieu of lc no 283 on bilaspurjharsuguda sections under sec railway

Construction of lhs in lieu of lc no 284 rob in lieu of lc no 283 on bilaspurjharsuguda sections under sec railway

Read more
Construction of four lane rob including underpass in lieu of lc no.90/spl at nadi ka phatak on jaipur sikar railway line

Construction of four lane rob including underpass in lieu of lc no.90/spl at nadi ka phatak on jaipur sikar railway line

Read more
Consultancy services for preparation of gad including seeking approval from railway and road authorities and detailed project report for the remaining work of construction of rob at lc no. 265 at jhunjhunu

Consultancy services for preparation of gad including seeking approval from railway and road authorities and detailed project report for the remaining work of construction of rob at lc no. 265 at jhunjhunu

Read more
Remaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)

Remaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise