Tender Details
Particulars | Details |
---|---|
Title |
Quot./Ee/Ismu Pd I/Cpwd/24/322(h)
|
Description |
Construction Of Centre Of Excellence In Safety, Oh And Dm For Ism At Dhanbad, Jharkhand. Sw: Aluminium Work For Chiller Control Room.
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 81681 |
Reference Number |
Quot./EE/ISMU-PD-I/CPWD/24/322(H) |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642438313638312451756f742e2f45452f49534d552d50442d492f435057442f32342f333232284829 |
Start Date | July 11, 2024 19:06 |
End Date |
15/07/2024 ( Expired 329 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreRequest for proposal for selection of private partner for establishment, operation, maintenance and management of existing 1.5 tesla mri centre at different government hospitals in west bengal under public private partnerships (ppp) mode (eom model)
Request for proposal for selection of private partner for establishment, operation, maintenance and management of existing 1.5 tesla mri centre at different government hospitals in west bengal under public private partnerships (ppp) mode (eom model)
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Read moreof your Industry type