Tender Details

Particulars Details
Title
Lowering /Shifting ( Multiple Time ) Due To Decreasing Quarry Water Of 3 Nos 4000 Gpm Pump Motor Set 12 Time With Delivery Range And Placeing All 3 Nos Pump Set At New Place Due To Dry Of Quarry Which Includes Dismantling Pipe Line Of 10 Inch 450
Description
Lowering /Shifting ( Multiple Time ) Due To Decreasing Quarry Water Of 3 Nos 4000 Gpm Pump Motor Set 12 Time With Delivery Range And Placeing All 3 Nos Pump Set At New Place Due To Dry Of Quarry Which Includes Dismantling Pipe Line Of 10 Inch 450
Organisation Coal India Limited (CIL)
Tender Id 2023_BCCL_286765_1
Reference
Number
BCCL/LA/EnM/F-19/23-24/116
Tender Fee
EMD 9846
Tender Value
Place General Manager office Lodna Area
Link https://coalindiatenders.nic.in
Start Date August 23, 2023 15:30
End Date

04/09/2023 ( Expired 658 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Shifting of ht 2000gpm pump motor in the lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at old ghutway patch-3 of damoda colliery.

Shifting of ht 2000gpm pump motor in the lower &#x0d side of the sump due to decreasing of water level and &#x0d other miscellaneous pumping and pipeline works at &#x0d old ghutway patch-3 of damoda colliery.

Read more
(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an

(1) making of 04 nos. of &#x0d motor dala end cover and &#x0d 04 nos.bearing grease cap &#x0d of at akwmc for 150hp and &#x0d 167 hp.(2) fabrication of &#x0d base plate h.t pump motor &#x0d to be installed at ocp &#x0d pump.(3) dismantling of &#x0d 3000 gpm pump flow more an

Read more
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Read more
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.

(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.

Read more
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level

Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level

Read more
Shifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area

Shifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area

Read more
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Read more
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area

Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area

Read more
(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive

(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive

Read more
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.

Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise