Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Lowering /Shifting ( Multiple Time ) Due To Decreasing Quarry Water Of 3 Nos 4000 Gpm Pump Motor Set 12 Time With Delivery Range And Placeing All 3 Nos Pump Set At New Place Due To Dry Of Quarry Which Includes Dismantling Pipe Line Of 10 Inch 450
|
Description |
Lowering /Shifting ( Multiple Time ) Due To Decreasing Quarry Water Of 3 Nos 4000 Gpm Pump Motor Set 12 Time With Delivery Range And Placeing All 3 Nos Pump Set At New Place Due To Dry Of Quarry Which Includes Dismantling Pipe Line Of 10 Inch 450
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_BCCL_286765_1 |
Reference Number |
BCCL/LA/EnM/F-19/23-24/116 |
Tender Fee | |
EMD | 9846 |
Tender Value | |
Place | General Manager office Lodna Area |
Link | https://coalindiatenders.nic.in |
Start Date | August 23, 2023 15:30 |
End Date |
04/09/2023 ( Expired 658 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of ht 2000gpm pump motor in the lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at old ghutway patch-3 of damoda colliery.
Shifting of ht 2000gpm pump motor in the lower 
 side of the sump due to decreasing of water level and 
 other miscellaneous pumping and pipeline works at 
 old ghutway patch-3 of damoda colliery.
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreShifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreShifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area
Shifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read more(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive
(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreof your Industry type