Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting And Re Installation (Multiple Times) Due To Decreasing Quarry Water Of 4000 Gpm 02 Nos 5 Times Pump Motor And With Delivery Range And Placing All 02 Nos. Pump Dismantling And Carrying Of 10 Inch Dia 50 No. Nos Ms Pipe Along With 16 N
|
Description |
Shifting And Re Installation (Multiple Times) Due To Decreasing Quarry Water Of 4000 Gpm 02 Nos 5 Times Pump Motor And With Delivery Range And Placing All 02 Nos. Pump Dismantling And Carrying Of 10 Inch Dia 50 No. Nos Ms Pipe Along With 16 N
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_309520_1 |
Reference Number |
BCCL/LA/EnM/F-19/24-25/028 |
Tender Fee | 0 |
EMD | 6436 |
Tender Value | |
Place | Lodna Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320708 |
Start Date | June 03, 2024 15:30 |
End Date |
14/06/2024 ( Expired 374 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Transporting and laying of 240 meter of hdpe 8 inch /ms pipes 6 inch vertical delivery range of patch b and making of 6 nos. of bends for installation of additional 600 gpm 550v pump at east bassuriya colliery
Read more(a)lowering of 02 nos. 4000gpm pump motor of jarlahi sump (b)lowering of 02 nos. pontoon along with their ht pump motor of main patch sump due to decrease of water level (c)other misc. jobs related to pumping and pipe line work under ampc.
(a)lowering of 02 nos. 4000gpm pump motor of jarlahi sump (b)lowering of 02 nos. pontoon along with their ht pump motor of main patch sump due to decrease of water level (c)other misc. jobs related to pumping and pipe line work under ampc.
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreShifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreShifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area
Shifting of 4000 gpm and 2000 gpm pump-motor along with di and extension of delivery range as per new location at jamunia patch of abocp mine under block-ii area
Read moreDismantling 8inch and 10inch dia ms pipe and clear area all parts at deco coal face (dragline it patch) and re-erection, installation of 4000 gpm new location at deco (purva face) under abocp mine block-ii area
Dismantling 8inch and 10inch dia ms pipe and clear area all parts at deco coal face (dragline it patch) and re-erection, installation of 4000 gpm new location at deco (purva face) under abocp mine block-ii area
Read moreShifting, installation of 3000 gpm, pump motor along with all electricals and 10 dia, delivery pipe line of bhowra south colliery approx length 642 mtr.
Shifting, installation of 3000 gpm, pump motor along with all electricals and 10 dia, delivery pipe line of bhowra south colliery approx length 642 mtr.
Read moreMaking of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Read moreDismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area
Dismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreof your Industry type