Tender Details

Particulars Details
Title
Construction Of Ipb Street ...
Description
Construction Of Ipb Street And Drain From Main Thaska Road To Angrej Singh Via H/O Jeet Saini In Ward No. 13 In Mc Ismailabad
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_490364_1
Reference
Number
2025183E2BA5 C9FD 4D22 996C 330B3A35D59C1255ULB
Tender Fee 2180
EMD 26000
Tender Value
Place Ismailabad
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=568649

Start Date December 15, 2025 14:30
End Date
Expired 22/12/2025

Expired 211 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise