Tender Details

Particulars Details
Title
Repair Of The First, Second, Third And Fourth Bed Of Converter In So2 Acid Plant During Ata 2025.
Description
Repair Of The First, Second, Third And Fourth Bed Of Converter In So2 Acid Plant During Ata 2025.
Organisation The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department
Tender Id 2025_FACT_850936_1
Reference
Number
3012/2024-2025/E31072
Tender Fee 0
EMD 5000
Tender Value -
Place FACT Udyogamandal
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=894490

Start Date February 26, 2025 19:30
End Date
Expired 13/03/2025

Expired 579 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Read more
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.

Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.

Read more
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year

Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year

Read more
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year

Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year

Read more
Amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for first year 2026 - 2027,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for second year 2027 - 2028,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for third year 2028 - 2029

Amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for first year 2026 - 2027,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for second year 2027 - 2028,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for third year 2028 - 2029

Read more
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01

Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01

Read more
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year

High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year

Read more
Repair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2024

Repair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2024

Read more
Repair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2024.

Repair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2024.

Read more
Repair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2025.

Repair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2025.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise