| Particulars | Details |
|---|---|
| Title |
Repair Of The First, Second, Third And Fourth Bed Of Converter In Dcda Acid Plant During Ata 2025.
|
| Description |
Repair Of The First, Second, Third And Fourth Bed Of Converter In Dcda Acid Plant During Ata 2025.
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2025_FACT_849674_1 |
|
Reference Number |
3012/2024-2025/E31026 |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | - |
| Place | FACT Udyogamandal |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=893180 |
| Start Date | February 18, 2025 23:30 |
| End Date |
Expired
06/03/2025
Expired 586 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreAmc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for first year 2026 - 2027,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for second year 2027 - 2028,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for third year 2028 - 2029
Amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for first year 2026 - 2027,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for second year 2027 - 2028,amc for continuous flow centrifuge (gea westfalia) (9300-8004-007) for third year 2028 - 2029
Read moreSupply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Read moreHigh end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
Read moreRepair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2024.
Repair of the first, second, third and fourth bed of converter in dcda acid plant during ata 2024.
Read moreRepair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2024
Repair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2024
Read moreRepair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2025.
Repair of the first, second, third and fourth bed of converter in so2 acid plant during ata 2025.
Read moreof your Industry type