Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Invitation For Bids: Converter Bed Repair In Dcda Acid Plant 🛠️ The Fertilisers And Chemicals Travancore Ltd., A Central Government Enterprise Under The Ministry/Department, Invites Bids From Experienced Vendors For The Repair Of The First, Second, Third, And Fourth Bed Of The Converter In The Dcda Acid Plant At Fact Udyogamandal During The Annual Turnaround (Ata) 2024. 📅 Bid Submission Deadline: 25th May 2024, 3:00 Pm Tender Fee: Inr 0 Emd: Inr 5000 Vendors Must Provide Detailed Technical And Financial Proposals, Including Their Methodology For Repair, Compliance With Safety Standards, And Adherence To Project Timelines. Keywords: Converter Bed Repair, Dcda Acid Plant, Fact Udyogamandal, Fertilisers And Chemicals Travancore Ltd, Annual Turnaround, Government Tender, Bid, Maintenance Services| Particulars | Details |
|---|---|
| Title |
Repair Of The First, Second, Third And Fourth Bed Of Converter In Dcda Acid Plant During Ata 2024.
|
| Description |
Repair Of The First, Second, Third And Fourth Bed Of Converter In Dcda Acid Plant During Ata 2024.
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2024_FACT_806588_1 |
|
Reference Number |
3012/2023-2024/E29461 |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | - |
| Place | FACT Udyogamandal |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847759 |
| Start Date | May 09, 2024 20:30 |
| End Date |
Expired
25/05/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreSupply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Supply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreUpgradation of sanitary and plumbing fittings and fixtures at the officers toilet block in ground floor, first floor and second floor of purta bhavan during the year 2026-2027.
Upgradation of sanitary and plumbing fittings and fixtures at the officers toilet block in ground floor, first floor and second floor of purta bhavan during the year 2026-2027.
Read moreSupply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Supply of group 01,site work for group 01,transportation charges for group 01,supply of mandatory spares for group 01,training charges for group 01,pwcamc charges for first 1 year for group 01,pwcamc charges for second 2 year for group 01,pwcamc charges for third 3 year for group 01,pwcamc charges for fourth 4 year for group 01,pwcamc charges for fifth 5 year for group 01,pre commissioning charges for group 01
Read moreTk elevator 8 passenger lift 544kg in library building no of floors 6 for the first year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the first year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the first year,tk elevator dumb waiter 250kg in mess-02 building no of floors 3 for the first year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the second year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the second year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the second year,tk elevator dumb waiter 250kg in mess 02 building no of floors 3 for the second year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the third year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the third year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the third year,tk elevator dumb waiter 250kg in mess 02 buil
Tk elevator 8 passenger lift 544kg in library building no of floors 6 for the first year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the first year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the first year,tk elevator dumb waiter 250kg in mess-02 building no of floors 3 for the first year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the second year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the second year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the second year,tk elevator dumb waiter 250kg in mess 02 building no of floors 3 for the second year,tk elevator 8 passenger lift 544kg in library building no of floors 6 for the third year,tk elevator 8 passenger lift 544kg in aerospace building no of floors 4 for the third year,tk elevator 8 passenger lift 544kg in science building no of floors 3 for the third year,tk elevator dumb waiter 250kg in mess 02 buil
Read moreHigh end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
High end surgical drill system with atachement,foot control,electric high speed motor,attachment for cranial surgery long straight,attachment for cranial surgery long angled,attachment for cranial surgery medium straight,attachment for cranial surgery short straight,dura guard rotating foot adult,dura guard rotating foot paediatric,duraguard rotating foot for laminectomy adult,universal drill perforation chuck,universal jacob chuck with key,attachment variaable straight nine cm,instruments tray,suitable trolley to be provided with each drill same manufacture,bone cutter drill bit for craniotomy adult,bone cutter drill bit for craniotomy paed,fast cutting match head burr long 3 mm,diamond burr match head long 3mm,fast cutting match head burr short 5mm or 6mm,cmc first year,cmc second year,cmc third year,cmc fourth year,cmc fifth year,cmc six year,cmc seven year,cmc eight year
Read moreof your Industry type