Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Tubing Or Tube Plugging Of Fhe In So2 Acid Plant During Ata 2024
|
| Description |
Re Tubing Or Tube Plugging Of Fhe In So2 Acid Plant During Ata 2024
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2024_FACT_799649_1 |
|
Reference Number |
3012/2023-2024/E29152 |
| Tender Fee | 0 |
| EMD | 12000 |
| Tender Value | - |
| Place | FACT Udyogamandal |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840565 |
| Start Date | March 11, 2024 19:30 |
| End Date |
Expired
26/03/2024
Expired 930 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRe-tubing of fhe in dcda acid plant during ata 2023.
Re-tubing of fhe in dcda acid plant during ata 2023.
Read moreRe-tubing and repairing of ihe in so2 acid plant during ata 2025.
Re-tubing and repairing of ihe in so2 acid plant during ata 2025.
Read moreRe-tubing and repairing of ihe in so2 acid plant during ata 2025.
Re-tubing and repairing of ihe in so2 acid plant during ata 2025, as per tender conditions.
Read moreRe-tubing and repairing of final heat exchanger (fhe) in dcda acid plant during ata 2025.
Re-tubing and repairing of final heat exchanger (fhe) in dcda acid plant during ata 2025, as per tender conditions.
Read moreMiscellaneous pipeline works in dcda or so2 acid plant and dcda fhe pressure testing during ata 2025.
Miscellaneous pipeline works in dcda or so2 acid plant and dcda fhe pressure testing during ata 2025.
Read moreAta 2025- insulation works for economisers, fhe and ihe ducts, other ducts etc. in so2 acid plant during ata 2025 at fact udyogamandal.
Ata 2025- insulation works for economisers, fhe and ihe ducts, other ducts etc. in so2 acid plant during ata 2025 at fact udyogamandal. 
Read moreTube cleaning and pressure testing of ihe/fhe in so2/acid plant.
Tube cleaning and pressure testing of ihe/fhe in so2/acid plant.
Read moreTube cleaning and pressure testing of ihe fhe in so2 acid plant.
Tube cleaning and pressure testing of ihefhe in so2 acid plant.
Read moreof your Industry type