Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Two Lane Rob In Lieu Of Level X Ing No. 59 At Km 1461/5 6 Between Brij Nagar Barsana Station Of Mtj Awr Section
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77557033 |
|
Reference Number |
CEN00AGC1924 |
| Tender Fee | 0 |
| EMD | 16.2 Lakh |
| Tender Value | - |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77557033/viewNitPdf_4723802.pdf |
| Start Date | October 29, 2024 23:38 |
| End Date |
Expired
29/11/2024
Expired 687 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Read moreConstruction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreConstruction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Construction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreof your Industry type