Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nbc Filtration System To Part No. 140952730197
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2025/B/6434561 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 09, 2025 22:18 |
| End Date |
Expired
19/07/2025
Expired 367 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreNit no 01 work no 01
Door to door collection of waste in all wards 1 to 25 for three years iot based door to door coolection of waste from all residential establishment and commerical establishemnt in both day and night shift of municipal board asind bhilwara rajastahn
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreAugmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)
Augmentation of dry fly ash
 transportation system
 at
 barauni thermal power station, stage-ii
 (2x250 mw)
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreBeautification works at digiana ashram ward no 58
Beautification works at digiana ashram ward no 58
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreProvision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Provision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Read moreof your Industry type