Tender Details

Particulars Details
Title
Short Term Maintenance Contract (Stmc) Of Road From Km 257.000 To 301.496 Of Nh 30 In The State Of Chhattisgarh. (Total Length 44.496 Km.)
Description
Short Term Maintenance Contract (Stmc) Of Road From Km 257.000 To 301.496 Of Nh 30 In The State Of Chhattisgarh. (Total Length 44.496 Km.)
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_864866_1
Reference
Number
58/CE/NH/TC/44-41/2025
Tender Fee 11800
EMD 4.42 Lakh
Tender Value
Place Jagdalpur
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=910320

Start Date June 24, 2025 22:30
End Date
Expired 29/07/2025

Expired 334 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Read more
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh

Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh

Read more
O and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur

O and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise