Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rani Pindrai To Sagouni Khurd Road Length 3.55 Km. Under Sub Division Narsinghpur.
|
| Description |
Construction Of Rani Pindrai To Sagouni Khurd Road Length 3.55 Km. Under Sub Division Narsinghpur.
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2025_PWDRB_446092_1 |
|
Reference Number |
NIT/13/2025-26/01 |
| Tender Fee | 16534 |
| EMD | 2.75 Lakh |
| Tender Value | |
| Place | Narsinghpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=525253 |
| Start Date | August 21, 2025 22:35 |
| End Date |
Expired
01/09/2025
Expired 306 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Restoration of rain damages on various road under section diggal sub division ramshehar (sh clearance of road side drain in various km
Read moreConstruction of cement concrete road at aamni khurd
Construction of cement concrete road at aamni khurd
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstruction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Construction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreof your Industry type