Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Performance Based Maintenance Contracts (Pbmc) Estimate Of Washim Dastapur Karanja Section Of Nh161 E (Design Km.0.000 To Km 60.374) Two Four Lane With Paved Shoulders Configuration In The State Of Maharashtra For 5 Year Maintenance Period
|
| Description |
Performance Based Maintenance Contracts (Pbmc) Estimate Of Washim Dastapur Karanja Section Of Nh161 E (Design Km.0.000 To Km 60.374) Two Four Lane With Paved Shoulders Configuration In The State Of Maharashtra For 5 Year Maintenance Period
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_828380_1 |
|
Reference Number |
06/EENH/AKL/2024-25/05, Dt.25.09.2024 |
| Tender Fee | 11800 |
| EMD | 64.3 Lakh |
| Tender Value | - |
| Place | Washim |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=870462 |
| Start Date | September 30, 2024 14:30 |
| End Date |
Expired
09/01/2025
Expired 643 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Development of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read morePerformance based maintenance contracts (pbmc) estimate of khamgaon shegaon section of nh548c (design km.0.000 to km 22.800) two four lane with paved shoulders configuration in the state of maharashtra for 5 year maintenance period.
Performance based maintenance contracts (pbmc) estimate of khamgaon shegaon section of nh548c (design km.0.000 to km 22.800) two four lane with paved shoulders configuration in the state of maharashtra for 5 year maintenance period.
Read moreMaintenance of khamgaon shegaon section of nh 548c (design km 0.000 to km 22.800) two.four lane with paved shoulders configuration in the state of maharashtra for 5 year maintenance period under performance based maintenance contract pbmc)
Maintenance of khamgaon shegaon section of nh 548c (design km 0.000 to km 22.800) two.four lane with paved shoulders configuration in the state of maharashtra for 5 year maintenance period under performance based maintenance contract pbmc)
Read morePerformance based maintenance contract of rehabiliatioan and upgradation of kherda nagzari nh161e (km 77.134 to 10.367) to two four lane with paved shoulders configuration for 5 years maintenance period in the state of maharashtra
Performance based maintenance contract of rehabiliatioan and upgradation of kherda nagzari nh161e (km 77.134 to 10.367) to two four lane with paved shoulders configuration for 5 years maintenance period in the state of maharashtra
Read morePerformance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation of nandgaon peth morshi warud mh mp border section of nh353 k (design km.0.000 to 95.390) to two four lane with paved shoulders configuration of nh353 k for 5
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation of nandgaon peth morshi warud mh mp border section of nh353 k (design km.0.000 to 95.390) to two four lane with paved shoulders configuration of nh353 k for 5
Read moreof your Industry type