| Particulars | Details |
|---|---|
| Title |
Protection Arrangements By Strengthening Bottom Layer The Cross Bund Spillway Using Rough Stone In Ash Dyke Area At Ttps
|
| Description |
Protection Arrangements By Strengthening Bottom Layer The Cross Bund Spillway Using Rough Stone In Ash Dyke Area At Ttps
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_508796_1 |
|
Reference Number |
CE SE C TTPS Spec. No 258 24 25 |
| Tender Fee | 0 |
| EMD | 21900 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=605177 |
| Start Date | December 07, 2024 23:40 |
| End Date |
Expired
14/12/2024
Expired 668 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreHandling ,transport and other mining services - percentage quote based - job contract for low-lying area development / backfilling of abandoned stone quarry / mine filling in the lead distance 0-100 kms radius of nspcl-bhilai using pond/bottom ash fr..
Handling ,transport and other mining services - percentage quote based - job contract for low-lying area development / backfilling of abandoned stone quarry / mine filling in the lead distance 0-100 kms radius of nspcl-bhilai using pond/bottom ash fr..
Read moreProtection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements in the cross bund spillway by shifting anf laying available heavy weight 12 mt to 15 mt concrete slabs from ash dyke gate to downstream of cross bund spillway at ttps
Protection arrangements in the cross bund spillway by shifting&#x0d anf laying available heavy weight 12 mt to 15 mt concrete&#x0d slabs from ash dyke gate to downstream of cross bund&#x0d spillway at ttps
Read moreAsh dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Ash dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&#x0d dyke area at ttps
Read moreEngaging 1 no. hired poclain for formation of ash bund for wetting the ash dyke surface at ttps
Engaging 1 no. hired poclain for formation of ash bund for&#x0d wetting the ash dyke surface at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from east side culvert for a length of 200 m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from east side culvert for a&#x0d length of 200 m in ash dyke area at ttps