| Particulars | Details |
|---|---|
| Title |
Strengthening And Raising The Cross Bund Spillway Using Armour Stone In Ash Dyke Area At Ttps
|
| Description |
Strengthening And Raising The Cross Bund Spillway Using Armour Stone In Ash Dyke Area At Ttps
|
| Organisation | TNEB Limited | TANGEDCO | CE-TTPS - TANGEDCO | SE-Civil-TTPS - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 6000 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 16, 2026 23:30 |
| End Date |
Open
02/11/2026
16 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Handling and transport on lumpsum basis - transport service, transportation charges for pond ash from the ash dyke of bltps to nearby mines voids abandoned stone quarries,handling and transport on lumpsum basis - excavation, excavation of pond ash,handling and transport on lumpsum basis - mine void filling work including ramming and watering,handling and transport on lumpsum basis - lump sum cost toward various activities required to be carried out for necessary approval permission compliance for utilisation of ash in mine quarry
Handling and transport on lumpsum basis - transport service, transportation charges for pond ash from the ash dyke of bltps to nearby mines voids abandoned stone quarries,handling and transport on lumpsum basis - excavation, excavation of pond ash,handling and transport on lumpsum basis - mine void filling work including ramming and watering,handling and transport on lumpsum basis - lump sum cost toward various activities required to be carried out for necessary approval permission compliance for utilisation of ash in mine quarry
Read moreProtection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements in the cross bund spillway by shifting anf laying available heavy weight 12 mt to 15 mt concrete slabs from ash dyke gate to downstream of cross bund spillway at ttps
Protection arrangements in the cross bund spillway by shifting&#x0d anf laying available heavy weight 12 mt to 15 mt concrete&#x0d slabs from ash dyke gate to downstream of cross bund&#x0d spillway at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&#x0d dyke area at ttps
Read moreAsh dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Ash dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Read moreProviding rcc culvert in ash dyke gate and providing stone pitching drain from ash dyke gate to outfall at ttps
Providing rcc culvert in ash&#x0d dyke gate and providing stone pitching drain from ash dyke&#x0d gate to outfall at ttps
Read moreEngaging 1 no. hired poclain for formation of ash bund for wetting the ash dyke surface at ttps
Engaging 1 no. hired poclain for formation of ash bund for&#x0d wetting the ash dyke surface at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from east side culvert for a length of 200 m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from east side culvert for a&#x0d length of 200 m in ash dyke area at ttps