Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Protection Arrangements In The Cross Bund Spillway By Shifting Anf Laying Available Heavy Weight 12 Mt To 15 Mt Concrete Slabs From Ash Dyke Gate To Downstream Of Cross Bund Spillway At Ttps
|
| Description |
Protection Arrangements In The Cross Bund Spillway By Shifting&Amp#X0d
Anf Laying Available Heavy Weight 12 Mt To 15 Mt Concrete&Amp#X0d
Slabs From Ash Dyke Gate To Downstream Of Cross Bund&Amp#X0d
Spillway At Ttps
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_591881_1 |
|
Reference Number |
CE SE C TTPS 231 2025 26 |
| Tender Fee | 0 |
| EMD | 7400 |
| Tender Value | - |
| Place | Tuticorin Thermal Power Station |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=706915 |
| Start Date | August 12, 2025 23:30 |
| End Date |
Expired
27/08/2025
Expired 374 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening top layer and raising the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&#x0d dyke area at ttps
Read moreEngaging 1 no. hired poclain for formation of ash bund for wetting the ash dyke surface at ttps
Engaging 1 no. hired poclain for formation of ash bund for&#x0d wetting the ash dyke surface at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from east side culvert for a length of 200 m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from east side culvert for a&#x0d length of 200 m in ash dyke area at ttps
Read moreProviding ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Providing ring bund by mill reject with gravel along the&#x0d inspection road from ash dyke gate to ch 120 m at ttps
Read moreProviding ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Providing ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Read moreRepair works to eastern side bund road by filling pot holes using gsb at ash dyke between ch_4100.00m and ch_5300.00m and at cross bund _ii)
Repair works to eastern side bund road by filling pot holes using gsb at ash dyke between ch_4100.00m and ch_5300.00m and at cross bund _ii)
Read moreProtection of ash dyke in ash bund area for units 4 and 5 and also regulating the flow in the existing spillway for the period from 01.04.2024 to 31.03.2025
Protection of ash dyke in ash bund area for units 4 and 5 and also regulating the flow in the existing spillway for the period from 01.04.2024 to 31.03.2025
Read moreof your Industry type