Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engaging 1 No. Hired Poclain For Formation Of Ash Bund For Wetting The Ash Dyke Surface At Ttps
|
| Description |
Engaging 1 No. Hired Poclain For Formation Of Ash Bund For&Amp#X0d
Wetting The Ash Dyke Surface At Ttps
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_588884_1 |
|
Reference Number |
CE SE C TTPS 200 2025 26 |
| Tender Fee | 0 |
| EMD | 8000 |
| Tender Value | - |
| Place | Tuticorin Thermal Power Station |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703493 |
| Start Date | August 04, 2025 23:30 |
| End Date |
Expired
18/08/2025
Expired 385 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wetting the surface of ash dyke by engaging hired water tanker with pumping arrangements for three months from the date of commencement of work at ttps
Wetting the surface of ash dyke by engaging hired water&#x0d tanker with pumping arrangements for three months from the&#x0d date of commencement of work at ttps
Read moreBituminous pavement for ntecl ash dyke bund roads
Bituminous pavement for ntecl ash dyke bund roads
Read moreFormation of bt road from gate no. 12 in 457.5 e road to ash dyke gate at ttps
Formation of bt road from gate no. 12 in 457.5 e road to ash&#x0d dyke gate at ttps
Read moreProtection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps
Protection arrangements by strengthening and raising the&#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&#x0d dyke area at ttps
Read moreProtection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProtection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps
Read moreProviding rcc culvert in ash dyke gate and providing stone pitching drain from ash dyke gate to outfall at ttps
Providing rcc culvert in ash&#x0d dyke gate and providing stone pitching drain from ash dyke&#x0d gate to outfall at ttps
Read moreConstruction of temporary bund at ash dyke of ntpc darlipali.
Construction of temporary bund at ash dyke of ntpc darlipali.
Read moreConstruction of temporary bund at ash dyke of ntpc darlipali.
Construction of temporary bund at ash dyke of ntpc darlipali.
Read moreFormation of wbm road on top of ash dyke at ntecl
Formation of wbm road on top of ash dyke at ntecl
Read moreof your Industry type