Tender Details

Particulars Details
Title
Engaging 1 No. Hired Poclain For Formation Of Ash Bund For Wetting The Ash Dyke Surface At Ttps
Description
Engaging 1 No. Hired Poclain For Formation Of Ash Bund For&Amp#X0d Wetting The Ash Dyke Surface At Ttps
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_588884_1
Reference
Number
CE SE C TTPS 200 2025 26
Tender Fee 0
EMD 8000
Tender Value -
Place Tuticorin Thermal Power Station
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703493

Start Date August 04, 2025 23:30
End Date
Expired 18/08/2025

Expired 385 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Wetting the surface of ash dyke by engaging hired water tanker with pumping arrangements for three months from the date of commencement of work at ttps

Wetting the surface of ash dyke by engaging hired water&amp#x0d tanker with pumping arrangements for three months from the&amp#x0d date of commencement of work at ttps

Read more
Bituminous pavement for ntecl ash dyke bund roads

Bituminous pavement for ntecl ash dyke bund roads

Read more
Formation of bt road from gate no. 12 in 457.5 e road to ash dyke gate at ttps

Formation of bt road from gate no. 12 in 457.5 e road to ash&amp#x0d dyke gate at ttps

Read more
Protection arrangements by strengthening and raising the existing bund towards a1 dyke from ch 0m to ch 200m in ash dyke area at ttps

Protection arrangements by strengthening and raising the&amp#x0d existing bund towards a1 dyke from ch 0m to ch 200m in ash&amp#x0d dyke area at ttps

Read more
Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps

Protection arrangements by strengthening bottom layer the cross bund spillway using rough stone in ash dyke area at ttps

Read more
Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps

Protection arrangements by strengthening ii layer the cross bund spillway using rough stone in ash dyke area at ttps

Read more
Providing rcc culvert in ash dyke gate and providing stone pitching drain from ash dyke gate to outfall at ttps

Providing rcc culvert in ash&amp#x0d dyke gate and providing stone pitching drain from ash dyke&amp#x0d gate to outfall at ttps

Read more
Construction of temporary bund at ash dyke of ntpc darlipali.

Construction of temporary bund at ash dyke of ntpc darlipali.

Read more
Construction of temporary bund at ash dyke of ntpc darlipali.

Construction of temporary bund at ash dyke of ntpc darlipali.

Read more
Formation of wbm road on top of ash dyke at ntecl

Formation of wbm road on top of ash dyke at ntecl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise