Tender Details
Particulars | Details |
---|---|
Title |
Stbt To Anandwadi Approach Road Sh 56 To Anandwadi) Km 0/00 To 1/300 Vr 128 Tq.Ahmedpur Dist.Latur Under D.P.D.C3054
|
Description |
Stbt To Anandwadi Approach Road Sh 56 To Anandwadi) Km 0/00 To 1/300 Vr 128 Tq.Ahmedpur Dist.Latur Under D.P.D.C3054
|
Organisation | RDD-CEO-LATUR | State Govt. and UT |
Tender Id | 2024_LATUR_1091177_1 |
Reference Number |
ZPL/W/E-T/66/2024-25 |
Tender Fee | 1080 |
EMD | 29330 |
Tender Value | |
Place | Tq.Ahmedpur |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1904339 |
Start Date | September 24, 2024 19:30 |
End Date |
01/10/2024 ( Expired 227 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreConstruction of retaining wall approach roads to minor bridge (2vx10.37m) across suddagadda vagu at km 0/200 of nh216 to housing colony road, gollaprolu village, kakinada district (2nd call)
Construction of retaining wall approach roads to minor bridge (2vx10.37m) across suddagadda vagu at km 0/200 of nh216 to housing colony road, gollaprolu village, kakinada district (2nd call)
Read morePr of roads from (1) gariadafadar para tsr camp to pmgsy road link no. l035 (l-1.00 km), (2) maiman sing para to maragang para (l027) (l-1.095 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting etc. durin
Pr of roads from (1) gariadafadar para tsr camp to pmgsy road link no. l035 (l-1.00 km), (2) maiman sing para to maragang para (l027) (l-1.095 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting etc. durin
Read morePr of roads from (1) t.k. road to tea garden at bagan bazar (l-2.10 km), (2) road form t.k. road at kalyanpur tri-junction (jci) to ruprai (l-0.63 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting, pucca
Pr of roads from (1) t.k. road to tea garden at bagan bazar (l-2.10 km), (2) road form t.k. road at kalyanpur tri-junction (jci) to ruprai (l-0.63 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting, pucca
Read moreSt bt of sh 63 to gaibisab bet road vr 74 ch 0/00 to 2/00 km tq udgir dist latur ( under dpdc 3054-2419 group b ) for year 2024-25
St bt of sh 63 to gaibisab bet road vr 74 ch 0/00 to 2/00 km tq udgir dist latur ( under dpdc 3054-2419 group b ) for year 2024-25
Read moreImprovement to distric border , mangrul to shelgavatol to ancharwadi to mdr- 13 road odr- 118 in km 0/150 to 1/00 ta. chikhali dist buldhana.
Improvement to distric border , mangrul to shelgavatol to ancharwadi to mdr- 13 road odr- 118 in km 0/150 to 1/00 ta. chikhali dist buldhana.
Read moreFdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreUp-gradation of rural road from sh 10 sh8 to guptapara ii community hall sh7 under pmgsyiii batch i 2024 25 package no. an01fe111 length 6.200 km
Up-gradation of rural road from sh 10 sh8 to guptapara ii community hall sh7 under pmgsyiii batch i 2024 25 package no. an01fe111 length 6.200 km
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Read moreof your Industry type