Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of Chhitari Tiraha To Rajgarh Ramgarha Road Length 6.10 Km Distt. Shivpuri (M.P.) With Over Head Line 11 Kv/Lt Pole Shifitng Work.
|
| Description |
Construction Work Of Chhitari Tiraha To Rajgarh Ramgarha Road Length 6.10 Km Distt. Shivpuri (M.P.) With Over Head Line 11 Kv/Lt Pole Shifitng Work.
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_287149_1 |
|
Reference Number |
11/2023-24 SHIVPURI DATE 26.06.2023 |
| Tender Fee | 15000 |
| EMD | 4.23 Lakh |
| Tender Value | |
| Place | CE PWD GWALIOR ZONE GWALIOR |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | July 03, 2023 16:00 |
| End Date |
Expired
11/07/2023
Expired 1080 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For the work of maintenance of ht/lt line before kanwar yatra 2026 to avoid any electrical accident in the area of ae-i/ii/iii under ee, eudd-11 kv and lt line-south, meerut.
For the work of maintenance of ht/lt line before kanwar yatra 2026 to avoid any electrical accident in the area of ae-i/ii/iii under ee, eudd-11 kv and lt line-south, meerut.
Read moreFor the work of maintenance of ht/lt line before kanwar yatra 2026 to avoid any electrical accident in the area of ae-i/ii/iii under ee, eudd-33 kv line, meerut.
For the work of maintenance of ht/lt line before kanwar yatra 2026 to avoid any electrical accident in the area of ae-i/ii/iii under ee, eudd-33 kv line, meerut.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Construction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of indar to gindora road length 6.40 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work.
Construction of indar to gindora road length 6.40 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work.
Read moreConstruction work of narayanpur to sikandpura road length 0.90 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work
Construction work of narayanpur to sikandpura road length 0.90 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work
Read moreConstruction of kusuan to chhapi road length 3.10 km and khatora to barod road length 3.00 km total length 6.10 km shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work
Construction of kusuan to chhapi road length 3.10 km and khatora to barod road length 3.00 km total length 6.10 km shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work
Read moreof your Industry type