Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of Daulatpur To Khaikheda Road Length 1.00 Km With Over Head Line 11 Kv/Lt Pole Shifting Work Distt. Shivpuri
|
| Description |
Construction Work Of Daulatpur To Khaikheda Road Length 1.00 Km With Over Head Line 11 Kv/Lt Pole Shifting Work Distt. Shivpuri
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2026_PWDRB_475775_1 |
|
Reference Number |
20/2025-26 SHIVPURI DATE 14.01.2026 |
| Tender Fee | 16534 |
| EMD | 2.03 Lakh |
| Tender Value | - |
| Place | WORKS |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=559178 |
| Start Date | January 22, 2026 15:30 |
| End Date |
Expired
06/02/2026
Expired 248 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreShifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreConstruction work of daulatpur to khaikheda road length 1.00 km with over head line 11kv/lt pole shifting work distt. shivpuri
Construction work of daulatpur to khaikheda road length 1.00 km with over head line 11kv/lt pole shifting work distt. shivpuri
Read moreConstruction work of bijroni bye pass road length 1.50 km with over head line 11kv/lt pole shifting work distt. shivpuri
Construction work of bijroni bye pass road length 1.50 km with over head line 11kv/lt pole shifting work distt. shivpuri
Read moreConstruction work of baarai to gudhal mandir road length 1.10 km with over head line 11kv/lt pole shifting work distt. shivpuri
Construction work of baarai to gudhal mandir road length 1.10 km with over head line 11kv/lt pole shifting work distt. shivpuri
Read moreConstruction of khaikheda to emdi kheda road length- 5.20 km including pole shifting division mandsour
Construction of khaikheda to emdi kheda road length- 5.20 km including pole shifting division mandsour
Read moreExternal electrification of overhead 33kv/11kv/lt line/dtr shifting street lighting in new constructed of rob on shivpuri pohari road railway crossing in district shivpuri length 0.710 km
External electrification of overhead 33kv/11kv/lt line/dtr shifting street lighting in new constructed of rob on shivpuri pohari road railway crossing in district shivpuri length 0.710 km
Read moreConstruction of indar to gindora road length 6.40 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work.
Construction of indar to gindora road length 6.40 km distt. shivpuri (m.p.) with over head line 11 kv/lt pole shifitng work.
Read moreof your Industry type