Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Narayanpur To Sikandpura Road Length 0.90 Km Distt. Shivpuri (M.P.) With Over Head Line 11 Kv/Lt Pole Shifitng Work
|
Description |
Construction Work Of Narayanpur To Sikandpura Road Length 0.90 Km Distt. Shivpuri (M.P.) With Over Head Line 11 Kv/Lt Pole Shifitng Work
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_283800_1 |
Reference Number |
07/2023-24 SHIVPURI DATE 13.06.2023 |
Tender Fee | 10000 |
EMD | 71210 |
Tender Value | |
Place | CE PWD GWALIOR ZONE GWALIOR |
Link | https://mptenders.gov.in |
Start Date | June 20, 2023 16:00 |
End Date |
28/06/2023 ( Expired 696 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreof your Industry type