Tender Details

Particulars Details
Title
Hiring Of 60000 L/H (Approx) Diesel Pump Including Operation, Maintenance, Suction, Delivery And Other Consumption For Fire Fighting From Sump To Nearby Coal Face Of Quarry No.03 For A Period Of 60 Days Under Kathara Colliery.
Description
Hiring Of 60000 L/H (Approx) Diesel Pump Including Operation, Maintenance, Suction, Delivery And Other Consumption For Fire Fighting From Sump To Nearby Coal Face Of Quarry No.03 For A Period Of 60 Days Under Kathara Colliery.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_325510_1
Reference
Number
KTC/PE/EnM/24-25/188 Date-11.01.2024
Tender Fee 0
EMD 6100
Tender Value
Place P.E. (EnM), Office of the PO, Kathara Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337416
Start Date January 13, 2025 15:30
End Date

23/01/2025 ( Expired 158 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc

1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc

Read more
(1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement

(1) erection of 3.3 kv over &#x0d head line installation of &#x0d 3000 gpm pump at ampl &#x0d sump for fire fighting of &#x0d ampl coal dump akwmc,ocp &#x0d katras &#x0d area.(2) &#x0d dismantling and diversion &#x0d of 6.6 kv power feeder for &#x0d placement

Read more
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026

Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &amp#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &amp#x0d days from 28 05 2025 to 31 03 2026&amp#x0d

Read more
Fire fighting work for a period of 365 days by contractual agency at coal stocks of kulda ocp, basundhara area

Fire fighting work for a period of 365 days by contractual agency at coal stocks of kulda ocp, basundhara area

Read more
(a) fire fighting arrangement with hose firefighting at different coal stock and coal seam fire (b) operation and mechanical maintenance of fog cannon at different places of bharatpur ocp (mine) for a period of one year

(a) fire fighting arrangement with hose firefighting at different coal stock and coal seam fire (b) operation and mechanical maintenance of fog cannon at different places of bharatpur ocp (mine) for a period of one year

Read more
Operation, repair and maintenance of water supply, sewerage, storm and fire fighting system of purab premium apartments, sector-88, sas nagar (for the period of 12 months i.e. 01-04-2025 to 31-03-2026

Operation, repair and maintenance of water supply, sewerage, storm and fire fighting system of purab premium apartments, sector-88, sas nagar (for the period of 12 months i.e. 01-04-2025 to 31-03-2026

Read more
Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.

Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.

Read more
Hiring and operation of diesel pump for fire fighting and pipeline laying at coal stock yard near crusher, dudhichua

Hiring and operation of diesel pump for fire fighting and pipeline laying at coal stock yard near crusher, dudhichua

Read more
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.

Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.

Read more
Comprehensive annual maintenance contract (camc) of 60 te capacity global make electronic road weighbridge installed at kathara colliery, kathara area for the period of two (02) year (730 days)

Comprehensive annual maintenance contract (camc) of 60 te capacity global make electronic road weighbridge installed at kathara colliery, kathara area for the period of two (02) year (730 days)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise