Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Request For Proposals: Diesel Pump Hiring For Dewatering Operations 🏭 Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Proposals For The Hiring Of A High Capacity Diesel Pump With Operation And Maintenance Services For Dewatering Operations At Kathara Colliery's Quarry No. 03. 🏗️💧 📅 Proposal Submission Deadline: May 31, 2024, 4:00 Pm The Scope Includes The Pump's Operation, Maintenance, Suction, Delivery, And All Necessary Consumables For Transferring Water From The Face Sump To The Main Sump Over A Period Of 45 Days. Interested Parties Must Submit An Earnest Money Deposit (Emd) Of Inr 39,000. Keywords: Diesel Pump, Dewatering, Hiring, Central Coalfields Limited, Public Sector Undertaking, Operation Maintenance, Kathara Colliery, Procurement, Emd| Particulars | Details |
|---|---|
| Title |
Hiring Of 60000 Lh (Approx) Diesel Pump Including Operation Maintenance, Suction, Delivery And Other Consumable For Dewatering Of Water From Face Sump To Main Sump Of Quarry No 03 For A Period Of 45 Days Under Kathara Colliery.
|
| Description |
Hiring Of 60000 Lh (Approx) Diesel Pump Including Operation Maintenance, Suction, Delivery And Other Consumable For Dewatering Of Water From Face Sump To Main Sump Of Quarry No 03 For A Period Of 45 Days Under Kathara Colliery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_308718_1 |
|
Reference Number |
KTC/PE(EnM)/E-Tender/24-25/08 |
| Tender Fee | 0 |
| EMD | 3900 |
| Tender Value | - |
| Place | Office of the Project Officer, PE (EnM), Kathara C |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319898 |
| Start Date | May 23, 2024 15:30 |
| End Date |
Expired
31/05/2024
Expired 870 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 60000l/h (approx) diesel pump including operation, maintenance, suction, delivery and other consumption for fire-fighting from sump to nearby coal face of quarry no.03 for a period of 60 days under kathara colliery.
Hiring of 60000l/h (approx) diesel pump including operation, maintenance, suction, delivery and other consumption for fire-fighting from sump to nearby coal face of quarry no.03 for a period of 60 days under kathara colliery.
Read moreLaying and jointing of pipeline range at lower kusmunda-2 (east) quarry sump and old dipka quarry sump for dewatering purposes at dipka expansion project.
Laying and jointing of pipeline range at lower kusmunda-2 (east) quarry sump and old dipka quarry sump for dewatering purposes at dipka expansion project.
Read moreShifting of all existed pipeline 8 inch, 10 inch about 600m 3x200m from present place of dewatering to other side of the sump to clean the coal face for better approach and coal extraction at quarry no. 03 of kathara colliery.
Shifting of all existed pipeline 8 inch, 10 inch about 600m 3x200m from present place of dewatering to other side of the sump to clean the coal face for better approach and coal extraction at quarry no. 03 of kathara colliery.
Read moreRepair of barbed wire fencing along top edge of quarry no.2 near dewatering point under kathara colliery length 300mtr
Repair of barbed wire fencing along top edge of quarry no.2 near dewatering point under kathara colliery length 300mtr
Read moreJoining at kujama quarry g patch sump to chatkari jore (approx 580 m) full length pipes 10 nos. bends and 18 nos short piece pipe and installation of 4000 gpm for dewatering of sump water kujama colliery under lodna area .
Joining at kujama quarry g patch sump to chatkari jore (approx 580 m) full length pipes 10 nos. bends and 18 nos short piece pipe and installation of 4000 gpm for dewatering of sump water kujama colliery under lodna area .
Read moreLaying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Read moreMaking new bed plate with installation of pump with motor at borira quarry for dewatering the coal face at docp.
Making new bed plate with installation of pump with motor at borira quarry for dewatering the coal face at docp.
Read moreLaying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Read moreDismantaling two nos pump with motor dismantling and shifting with re- installation at borira quarry for dewatering the coal face at docp.
Dismantaling two nos pump with motor dismantling and shifting with re- installation at borira quarry for dewatering the coal face at docp.
Read moreRepairing and rewinding of motor 450kw 6.6 kv marathon make with sl. no. 3f660863/7 running at 3 no. quarry for dewatering under kathara colliery.
Repairing and rewinding of motor 450kw 6.6 kv marathon make with sl. no. 3f660863/7 running at 3 no. quarry for dewatering under kathara colliery.
Read moreof your Industry type