Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Widening Of 2 Lane Road With Paved Shoulders (7.0 M. Bt To 10.0 M. Width Bt) From Bagad Tiraha (Km. 95/600) To Near Seethal (86/600) Sh 14
|
Description |
Widening Of 2 Lane Road With Paved Shoulders (7.0 M. Bt To 10.0 M. Width Bt) From Bagad Tiraha (Km. 95/600) To Near Seethal (86/600) Sh 14
|
Organisation | Government of Rajasthan |
Tender Id | 2023_RSRDC_351235_1 |
Reference Number |
RSRDC NIT NO.263/2023-24 DATED 14.07.2023 |
Tender Fee | 11800 |
EMD | 20.28 Lakh |
Tender Value | |
Place | PD RSRDC UNIT BHARATPUR |
Link | https://eproc.rajasthan.gov.in |
Start Date | July 26, 2023 16:30 |
End Date |
31/07/2023 ( Expired 707 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreof your Industry type