Tender Details

Particulars Details
Title
Repairing Of 02 Nos. Bend Pulley/Drum And Snub Drum Dia (654 X1400mm) Of Unit Mo. 133 A,B And 02 Nos. Spur Gear And Pinion Of Unit No. 118 B Shuttle Conveyor Of Pre Washery
Description
Repairing Of 02 Nos. Bend Pulley/Drum And Snub Drum Dia (654 X1400mm) Of Unit Mo. 133 A,B And 02 Nos. Spur Gear And Pinion Of Unit No. 118 B Shuttle Conveyor Of Pre Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_302658_1
Reference
Number
PO/KW/eTender/23-24/129, dated 25.02.2024
Tender Fee 0
EMD 3800
Tender Value -
Place Kedla Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313530

Start Date February 27, 2024 15:30
End Date
Expired 08/03/2024

Expired 909 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Complete repairing of 02 nos. bend drum and snub drum dia (654x1400mm) unit no. 133aandb belt conveyor and repairing or fabrication of 02 nos. tail drum pulley dia 550x1800mm 112aandb of pre washery at kedla washery.

Complete repairing of 02 nos. bend drum and snub drum dia (654x1400mm) unit no. 133aandb belt conveyor and repairing or fabrication of 02 nos. tail drum pulley dia 550x1800mm 112aandb of pre washery at kedla washery.

Read more
Repairing of head drum pulley of 133a and 02 nos. bend snub drum of 116 a and b conveyor of pre washery at kedla washery.

Repairing of head drum pulley of 133a and 02 nos. bend snub drum of 116 a and b conveyor of pre washery at kedla washery.

Read more
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery

Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery

Read more
Complete repairing of 02 nos. (pairs) spure and pinion gear of unit no. 118b belt conveyor and 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery

Complete repairing of 02 nos. (pairs) spure and pinion gear of unit no. 118b belt conveyor and 06 halves gc-10 gear coupling for unit no. 116a, 133a and 133b of pre-washery at kedla washery

Read more
Replacement of belt conveyor in unit no. 116b-222 m, 133a- 240m and 04nos. snub drum lagging of 133b belt conveyor of pre-washery at kedla washery

Replacement of belt conveyor in unit no. 116b-222 m, 133a- 240m and 04nos. snub drum lagging of 133b belt conveyor of pre-washery at kedla washery

Read more
A)dismantling of take-up snub drum size 1600 x 500 x 10 mm 02 nos. (left and right), repairing an installation of the same including repairing of bearing block take-up snub drum (size-22220) 04 nos. of unit no. 950 in rlb section

A)dismantling of take-up snub drum size 1600 x 500 x 10 mm 02 nos. (left and right), repairing an installation of the same including repairing of bearing block take-up snub drum (size-22220) 04 nos. of unit no. 950 in rlb

Read more
Making of 2 nos. snub drum of conveyor belt at bhojudih coal washery.

Making of 2 nos. snub drum of conveyor belt at bhojudih coal washery.

Read more
A)repairing of connecting shaft size 1700 x 100 mm and 02 nos. coupling of unit no. 138 shuttle conveyor and b)repairing and changing of head snub drum shaft, hubs and its shell of unit no. 136 in raw coal section of kathara washery

A)repairing of connecting shaft size 1700 x 100 mm and 02 nos. coupling of unit no. 138 shuttle conveyor and b)repairing and changing of head snub drum shaft, hubs and its shell of unit no. 136 in raw coal section of kathara washery

Read more
Fallen take-up and belt re-installation and 165 nos. damaged idler frame repairing of unit no. 116a and b, 133a and b and 118b carriage re-installation of pre-washery at kedla washery

Fallen take-up and belt re-installation and 165 nos. damaged idler frame repairing of unit no. 116a and b, 133a and b and 118b carriage re-installation of pre-washery at kedla washery.

Read more
Replacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.

Replacement of tail drum and snub drum assemblies, including dismantling of existing worn-out drums, strengthening of tail drum base frame and replacement of four snub drum bearing blocks for unit 201 belt conveyor at moonidih coal washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise