Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Belt Conveyor In Unit No. 116 B 222 M, 133 A 240m And 04nos. Snub Drum Lagging Of 133 B Belt Conveyor Of Pre Washery At Kedla Washery
|
Description |
Replacement Of Belt Conveyor In Unit No. 116 B 222 M, 133 A 240m And 04nos. Snub Drum Lagging Of 133 B Belt Conveyor Of Pre Washery At Kedla Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329227_1 |
Reference Number |
PO/KW/E-TENDER/24-25/126, Date-16/02/2025 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | KEDLA WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341247 |
Start Date | February 17, 2025 15:30 |
End Date |
28/02/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreReplacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreProcurement of spares for piston unit of m/s weir mineral make geho pumps model no.tzpm 250g installed at silo in hcsd system of unit 10 and 11, stps, sarni.
Procurement of spares for piston unit of m/s weir mineral make geho pumps model no.tzpm 250g installed at silo in hcsd system of unit 10 and 11, stps, sarni.
Read moreRepair/renewal/replacement under maint of lt oht, ug cables and connected services of otm area in the aor of age e/m under ge (army) suratgarh at suratgarh mil stn
Repair/renewal/replacement under maint of lt oht, ug
 cables and connected services of otm area in the aor of age e/m under ge (army) suratgarh at suratgarh mil
 stn
Read moreConsultancy services for preparation of detailed project report and pre-construction activities for construction of seven tunnels of 60 m length each at three different locations, in the union territory of ladakh
Consultancy services for preparation of detailed project report and pre-construction activities for construction of seven tunnels of 60 m length each at three different locations, in the union territory of ladakh
Read morePainting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Read moreConstruction of function halls at udandapur, 1 no. and vallur 1 no. (total 2 nos.) including compound wall under jadcherla (m) in mahabubnagar district.
Construction of function halls at udandapur, 1 no. and vallur 1 no. (total 2 nos.) including compound wall under jadcherla (m) in mahabubnagar district.
Read moreRepair/replacement of internal wiring and allied works of md accn of officers, jcos, ors in lower garrison at yol cantt under age e/m of ge (kh) yol
Repair/replacement of internal wiring and allied works of md accn of officers, jcos, ors in lower garrison at yol cantt under age e/m of ge (kh) yol
Read moreof your Industry type