Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Civil, Structure And Allied Works For Sustainable Plant Operation Of 2 G Ethanol Plant At 100 Percent Capacity.
|
| Description |
Civil, Structure And Allied Works For Sustainable Plant Operation Of 2 G Ethanol Plant At 100 Percent Capacity.
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2024_PR_178197_1 |
|
Reference Number |
RPRC242201 |
| Tender Fee | 0 |
| EMD | 35076 |
| Tender Value | - |
| Place | PRPC |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188373 |
| Start Date | June 15, 2024 17:30 |
| End Date |
Expired
21/06/2024
Expired 842 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreProviding of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreCivil work for installation of supplementary facilities for sustainable operation of 2g ethanol plant
Civil work for installation of supplementary facilities for sustainable operation of 2g ethanol plant
Read moreOperation & maintenance of 1g & 2g ethanol plant at bargarh, odisha
Operation & maintenance of 1g & 2g ethanol plant at bargarh, odisha
Read moreof your Industry type