Tender Details

Particulars Details
Title
Design, Supply, Testing, Installation And Commissioning Along With Comprehensive Annual Maintenance Contract (Camc) For 10 (Ten) Years Of A Grid Connected 1 Mw / 4 M Wh (4 Hour) Battery Energy Storage System (Bess) On 100 Percent Turnkey Basis At The 33/11 K V Waterworks Sub Station Karimnagar District Of Tgnpdcl.
Description
Design, Supply, Testing, Installation And Commissioning Along With Comprehensive Annual Maintenance Contract (Camc) For 10 (Ten) Years Of A Grid Connected 1 Mw / 4 M Wh (4 Hour) Battery Energy Storage System (Bess) On 100 Percent Turnkey Basis At The 33/11 K V Waterworks Sub Station Karimnagar District Of Tgnpdcl.
Organisation Northern Power Distribution company of TS LTD-CGM P& R NPDCL
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 0
Place Telangana
Link Login to view
Start Date September 17, 2026 11:00
End Date
Open 15/10/2026

4 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Read more
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

Read more
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

Read more
Rfp for selection of contractor for bos of 600 mw/1200 mwh bess project at nandiyal, ap (ac package)

Rfp for selection of contractor for bos of 600 mw/1200 mwh bess project at nandiyal, ap (ac package)

Read more
Battery energy storage system package bess-06 for 25 mw/ 50 mwh battery energy storage system at simhachalam andhra pradesh

Battery energy storage system package bess-06 for 25 mw/ 50 mwh battery energy storage system at simhachalam andhra pradesh associated with setting up of 1,000 mw/ 2,000 mwh battery energy storage system (bess) in andhra pradesh under tariff-based competitive bidding with viability gap funding supported through psdf

Read more
Package punjab-bess-02 for setting up of 100 mw/200 mwh battery energy storage system at 220 kv bhatinda substation, punjab

Package punjab-bess-02 for setting up of 100 mw/200 mwh battery energy storage system at 220 kv bhatinda substation, punjab associated with setting up of 250 mw/500 mwh standalone battery energy systems (bess) in punjab under tariff-based global competitive bidding with viability gap funding supported through psdf under tariff-based competitive bidding route under boo model.

Read more
Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangement in karur district.

Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangement in karur district.

Read more
Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangementinthiruvarur district, tamil nadu

Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangementinthiruvarur district, tamil nadu

Read more
Rfs for setting up of 500 mw/1000 mwh bess under tariff based global competitive bidding in the premises of power projects owned by rvunl and gss of rvpnl along with additional green shoe option of 500 mw/1000 mwh with vgf

Rfs for setting up of 500 mw/1000 mwh bess under tariff based global competitive bidding in the premises of power projects owned by rvunl and gss of rvpnl along with additional green shoe option of 500 mw/1000 mwh with vgf

Read more
Design, engineering, supply, packing and forwarding, transportation, unloading, storage, installation, testing and commissioning of grid connected battery energy storage system (bess) of capacity 1mw/2.50 mwh at 28 mw solar power plant, mandamarri, mancherial dist. telangana state including 10 (ten) years of comprehensive om.

Design, engineering, supply, packing and forwarding, transportation, unloading, storage, installation, testing and commissioning of grid connected battery energy storage system (bess) of capacity 1mw/ 2.50mwh at 28mw solar power plant, mandamarri, mancherial dist, telangana state. including 10 (ten) years of comprehensive om.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise