Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Testing, Installation And Commissioning Along With Comprehensive Annual Maintenance Contract (Camc) For 10 (Ten) Years Of A Grid Connected 1 Mw / 4 M Wh (4 Hour) Battery Energy Storage System (Bess) On 100 Percent Turnkey Basis At The 33/11 K V Waterworks Sub Station Karimnagar District Of Tgnpdcl.
|
| Description |
Design, Supply, Testing, Installation And Commissioning Along With Comprehensive Annual Maintenance Contract (Camc) For 10 (Ten) Years Of A Grid Connected 1 Mw / 4 M Wh (4 Hour) Battery Energy Storage System (Bess) On 100 Percent Turnkey Basis At The 33/11 K V Waterworks Sub Station Karimnagar District Of Tgnpdcl.
|
| Organisation | Northern Power Distribution company of TS LTD-CGM P& R NPDCL |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 17, 2026 11:00 |
| End Date |
Open
15/10/2026
4 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read more(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
Read more(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
Read moreRfp for selection of contractor for bos of 600 mw/1200 mwh bess project at nandiyal, ap (ac package)
Rfp for selection of contractor for bos of 600 mw/1200 mwh bess project at nandiyal, ap (ac package)
Read moreBattery energy storage system package bess-06 for 25 mw/ 50 mwh battery energy storage system at simhachalam andhra pradesh
Battery energy storage system package bess-06 for 25 mw/ 50 mwh battery energy storage system at simhachalam andhra pradesh associated with setting up of 1,000 mw/ 2,000 mwh battery energy storage system (bess) in andhra pradesh under tariff-based competitive bidding with viability gap funding supported through psdf
Read morePackage punjab-bess-02 for setting up of 100 mw/200 mwh battery energy storage system at 220 kv bhatinda substation, punjab
Package punjab-bess-02 for setting up of 100 mw/200 mwh battery energy storage system at 220 kv bhatinda substation, punjab associated with setting up of 250 mw/500 mwh standalone battery energy systems (bess) in punjab under tariff-based global competitive bidding with viability gap funding supported through psdf under tariff-based competitive bidding route under boo model.
Read moreSelection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangement in karur district.
Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangement in karur district.
Read moreSelection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangementinthiruvarur district, tamil nadu
Selection of developer for setting up of grid connected 15 mwsolar pv power project and 15 mw/ 45 mwh bess arrangementinthiruvarur district, tamil nadu
Read moreRfs for setting up of 500 mw/1000 mwh bess under tariff based global competitive bidding in the premises of power projects owned by rvunl and gss of rvpnl along with additional green shoe option of 500 mw/1000 mwh with vgf
Rfs for setting up of 500 mw/1000 mwh bess under tariff based global competitive bidding in the premises of power projects owned by rvunl and gss of rvpnl along with additional green shoe option of 500 mw/1000 mwh with vgf
Read moreDesign, engineering, supply, packing and forwarding, transportation, unloading, storage, installation, testing and commissioning of grid connected battery energy storage system (bess) of capacity 1mw/2.50 mwh at 28 mw solar power plant, mandamarri, mancherial dist. telangana state including 10 (ten) years of comprehensive om.
Design, engineering, supply, packing and forwarding, transportation, unloading, storage, installation, testing and commissioning of grid connected battery energy storage system (bess) of capacity 1mw/ 2.50mwh at 28mw solar power plant, mandamarri, mancherial dist, telangana state. including 10 (ten) years of comprehensive om.
Read moreof your Industry type